What's Going On
We’re sorry, but due to additional engineering work on our network, as well as a high number of our train crew impacted by COVID-19 we will be making the following alterations to our services from Monday 04/01/2021 onwards:
- Reduction in service on the Hounslow Loop to one train per hour in both directions.
- Reduction of service between Shepperton and London Waterloo (via Wimbledon) to 1 train per hour in both directions.
- Reduction of service between Weybridge and London Waterloo (via Virginia Water) to 1 train per hour in both directions.
- Reduction of stopping services between Basingstoke and London Waterloo to 1 train per hour in both directions.
- Reduction of service between Alton and London Waterloo to 1 train per hour in both directions.
- Removal of peak time additional services from Reading, Shepperton (via Twickenham), Farnham and Hounslow.
- Removal of the 3 additional Epsom to Waterloo services in the morning peak.
- Reduction of services between Salisbury and London Waterloo to an hourly frequency during peak periods. Some other services may also be altered or cancelled.
- Removal of the twice daily Salisbury to Bristol services.
Further changes to timetables may need to be made at short notice in the coming weeks and months. We strongly recommend checking your journey using our
Journey Planning and
live train times pages closer to the time of your travel.