  1. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    No paint required - as you can see below the yellow line is attached just like the tactile strip, or you can fit blanks which match the rest of the platform surface. https://www.flickr.com/photos/n80426/50918802031/ https://www.flickr.com/photos/n80426/50918113693/
  2. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    That might be the thinking but surely yellow lines fade too? AIUI the same platform system was used at East Croydon without one: https://flic.kr/p/2jFrNoH
  3. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    Ultimately the yellow line is where the designers of the pre-fab platform system put it - presumably at a distance that will always be compliant with the relevant standards wherever it's used. Not sure they need a separate line mind, I'd have thought the bright yellow tactile strip would suffice?
  4. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    The 483-484 adaptor finally put to good use! Thanks to James for capturing the last of the 483s leaving Ryde for Sandown
  5. Chris125

    Island Line Upgrade

    It's nice to know I'm not imagining things!
  6. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    They never have, train movements aren't updated live on the island - paths may get uploaded but test trains run as required, the ryde pier webcam is the best way to see what's actually happening.
  7. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    Preparations appear to be stepping up with an early start today, the first time I've heard a train before 7am since the line closed - after weeks of 002 and 003, it also looks like they've moved onto testing (fault free running?) the other pair.
  8. Chris125

    Island Line Upgrade

    Those were old photos; alas it's been the best part of a year since the last 483 ran through Esplanade, so the number may well have been changed. It may only be an issue up close, perhaps just the stopping position for 4-car trains - the second shot below does seem to show the signal's been...
  9. Chris125

    Island Line Upgrade

    Sort of? The signal on the right hand side (34) is still in use but must be hard to see from some angles in the new trains - so they've re-used 35 on the left to show the same aspect, 'co-acting' I think it's called.
  10. Chris125

    Island Line Upgrade

    I believe a decision to remodel the existing station has already been made, there are no plans for a new building given the risk and funding available.
  11. Chris125

    Island Line Upgrade

    It's not in the four foot... but there *is* a co-acting signal! I realised yesterday that the now-redundant signal on the shuttle platform (see below) might explain the lack of obvious change, with photos from the footbridge showing it uncovered again and perhaps a little wonky. A quick walk...
  12. Chris125

    BEMUs and on-route charging

    Vivarail to unveil 80mph super-Class 230 at COP26 Unless something goes drastically wrong this must remove any doubt about them getting the Greenford gig.
  13. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    Of course, which illustrates why we got so lucky with the D78s - they really are at the limit of what can fit.
  14. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    Fantastic shot by James, they do seem to be clocking up the miles right now - hopefully fault free? 484002 Ryde Tunnel 04/10/21 by James_Pilbeam, on Flickr
  15. Chris125

    East-West Rail (EWR): Oxford-Bletchley construction progress

    An interesting PWI presentation on the history, construction and partial rebuilding of the Bletchley Flyover:
  16. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    Seems daily test running now extends up the pier - some 2-car trains ran in the morning, while a 4-car set arrived at Esplanade at around 13:25 past the hour (returning 10 mins later) on the pier webcam and repeating roughly every hour. All the platforms have been raised or rebuilt for 4-car...
  17. Chris125

    Island Line Upgrade

    The new craft did suffer reliability issues in the early years, but they and - crucially - the new berthing arrangements at Ryde Pier have transformed it's performance in bad weather; it keeps going through almost anything these days, and is often one of the last services to continue running.
  18. Chris125

    Class 484 replacing class 483 on the island line: progress updates

    The first 4-car runs on the island today:
  19. Chris125

    Island Line Upgrade

    They've been out seemingly every day (bar sundays?) for the last two weeks, now using a pair passing at Brading - not necessarily matching the timings mind. I thought Double Deckers did go through Havenstreet many years ago?
  20. Chris125

    Island Line Upgrade

    Yesterday's events on Railcam: Not the most dignified job! Wouldn't be fun climbing down that ladder on a stormy night...