• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. MarkyT

    Suggested new Warrington - Widnes alignment for HS2 Liverpool branch and NPR trains.

    As it says in the title. New stations at: Warrington Bank Quay - High level on new viaduct over south end of Bank Quay (WCML) station. Near town centre and easy interconnection with residual WCML traffic. Synergy with Soap Factory redevelopment. Widnes South - Well located for town centre and...
  2. MarkyT

    Which countries recommend the use of masks or have laws mandating the use of masks?

    From Masks4All, this is a useful resource detailing the countries that have recommended or required public mask-wearing during the ongoing coronavirus pandemic. https://masks4all.co/what-countries-have-mask-laws/
  3. MarkyT

    Cloth masks, scarves and bandanas to be 'encouraged' with no compulsion

    It appears highly likely that the British Government will finally change its advice in the next few days on public mask-wearing, following new recommendations from its scientific advisors. Cloth masks, scarves, and bandanas covering the mouth would be 'encouraged' in public but there will be no...
  4. MarkyT

    My idea for a new layout at Herne Hill

    A new layout idea for Herne Hill in South London. The arrangement places the slow Thameslink (TL) tracks in the middle of the twin island platform layout, with the fast Chatham (LCD) tracks weaving around the outside. Thus stopping TL trains need to cross only one fast line at a time and more...
  5. MarkyT

    Ideas for a Great Surrey Loop service using reopened lines

    Moderator note: split from https://www.railforums.co.uk/threads/guildford-horsham-shoreham-line-reopening-proposal.184940/ If the Guildford - Horsham section proved feasible with GWR diesel/bi-mode trains, an option might be for them to continue on through Horsham in the same direction to...
  6. MarkyT

    Person hit by train and all services stopped in Devon (28/03)

    https://www.devonlive.com/news/devon-news/devon-trains-live-cancelled-exeter-2693842 At Stoke Canon, a MCB-CCTV crossing supervised from Exeter PSB. The latest update states: Some very odd aspects in the final two paragraphs: Linked incidents and police conduct. A chase perhaps?
  7. MarkyT

    Ebbw Vale line suggestions for service provision and infrastructure changes

    Moderator note: Split from https://www.railforums.co.uk/threads/ebbw-vale-redoubling.144142 It was platform capacity at Newport that scuppered that idea when the Ebbw service was first envisaged. Just wait until Newport resignalling they said. We're still waiting. If I were in charge I would...
  8. MarkyT

    CrossCountry 10 minute reservations

    Mod Note: Posts #1 - #11 originally in this thread. When I first travelled on XC after they introduced the seat booking en route 'feature' I was worried and spoke to the guard about it. He told me I could book the seat I had occupied via their app/website. At the time I didn't have any kind of...
  9. MarkyT

    HS4Air – “An M25 for high speed trains”

    A new high-speed railway connecting HS1 and HS2 around the south of London via both Gatwick and Heathrow has been proposed by engineering consultancy Expedition for new domestic and international services, including a fast transfer link between the airports...
  10. MarkyT

    Solent to Swindon. A Transwilts / Three Rivers community proposal for 2019 timetable

    A community rail proposal to connect the TransWilts corridor with Test Valley and Solent area local trains. Better services would be possible from a smaller fleet, used more efficiently. The proposal introduces new direct journey opportunities from Swindon and northern Wiltshire to Southampton...
  11. MarkyT

    ETCS Discussion

    Mod Note: This thread has been split from the discussion on the Dovey Junction loop. Gareth, I like your article on the 'Dodgital railway'. ETCS cannot in itself provide extra capacity on the rural railway. It was the additional and extended passing loops that did that on Cambrian...
  12. MarkyT

    Royal Scot, Torbay Express, 04/07/2016

    I saw the return up working running a little late at Torquay earlier and just looked at RTT. The train appears to have lost more time progressively until Taunton and finally Cogload where it was 87L. Then there was no report on its booked route via Westbury and Bath all the way to Bristol where...
  13. MarkyT

    TV Programme Alert: Flying Scotsman With Robson Green, ITV1, 9pm, Friday 22/04/2016

    Transmission (TX) : Fri 22 Apr 2016 Time: 9.00pm - 10.00pm Channel: ITV1 This programme features Robson Green interviewing my father, Peter Townend, the last shedmaster at Kings Cross 'Top Shed', whilst walking around what remains of the Doncaster "Plant" Works, where he had served his...
  14. MarkyT

    Eurolines / National Express

    A bit of a rant I'm afraid, and I didn't know whether to put this in International or here, but here goes . . . I've had an interesting time dealing with Eurolines/National Express over the last 24 hours. My father's oldest surviving friend travelled over from Switzerland by coach last week...
  15. MarkyT

    New aircraft seating layout - Could this also be applied to rail vehicles?

    A French company, Zodiac Aerospace, has developed a new seating concept: High density with business class width, folding seats arranged in alternating directions across rows, so passengers in adjacent seats would be facing each other. For small groups it allows people to interact and converse...
  16. MarkyT

    60163 Tornado - Torbay Express 12th July 2015 - Goodrington, Torre.

    https://youtu.be/EWsLRJz0dSg Another run of this popular steam excursion from Bristol to Kingswear for Dartmouth. This time, locomotive No. 60163 "Tornado" hauls the train. Newly turned out in Apple green after last year's dark blue livery, this extraordinary modern replica of a previously...
  17. MarkyT

    The first Torbay Express of 2015

    This is the first run of the season for this regular steam excursion from Bristol to Kingswear for Dartmouth. Today BR standard locomotive No. 70000 "Britannia", built in 1951, hauls the train which is first seen at Oyster Bend bridge near Goodrington, Paignton, then at Kingswear over the river...
  18. MarkyT

    Reading Green Park Station Funding Approved

    http://www.bbc.co.uk/news/uk-england-berkshire-30128617 Planning permission has been granted for a similar scheme in the past. I found one application 'permitted' in July 2004 under Planning Application Number 031361 on the Reading Borough Council planning website here...
  19. MarkyT

    Suggestion for all HS2 stations and trains to use UK standard platform dimensions

    A suggestion - HS2 should be built with UK standard platform heights and clearances throughout. I'm not suggesting building the line to UK loading gauge in terms of bridge and tunnel clearances, just using standard UK platform height and lateral clearance for all trains, so they could all use...
  20. MarkyT

    Oxford Station Layout Development

    Following a recent discussion in the General Forum about proposed passenger services on the Cowley Branch http://www.railforums.co.uk/showthread.php?t=107481 , here are some ideas for further development of the track and station layout at Oxford and it's approaches...

Top