• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. T

    Cafe on Platform 6 Crewe

    Ebeneezers isnt that far?
  2. T

    RMT turns down Network Rail Pay Offer

    Its a performance related bonus, if all the scorecards hit their targets (good luck with that ever happening), the full amount is paid out. I am assuming that RMT want that got rid off and the bonus amount just paid into salaries regardless of performance.
  3. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    Oxford has the new down platform being built and also the opportunity to get the unit out the way as an ECS to the sidings.
  4. T

    Network Rail CP7 Plans

    Its not going to be Lancaster.
  5. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    Bicester and Leamington are appalling places to terminate at from the south, Banbury would have legs if it was ever considered.
  6. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    No chance of Bicester or Leamington.
  7. T

    XC trains behing heavily used by Wolverhampton to Birmingham commuters: how could this be resolved?

    People naturally gravitate to the fastest trains, so the WMT are out as they are all shacks to International. People are going to for example bin the 0812 to New St when the 0827 or 0830 gets there shortly after it.
  8. T

    Cross Country cutting out Winchester and Basingstoke stops

    Still would take the same time as you trundle along to keep the timetable.
  9. T

    What is the point of Old Oak Common?

    Right, so it not really OOC to Brighton then.
  10. T

    WCML Power Supply & Auto Transformer Upgrade

    Power supply is computer modelled by the principal route engineer (PRE)
  11. T

    What is the point of Old Oak Common?

    How would you do that? There is no connection to the WLL
  12. T

    Why are XC allowed to continue?

    Struggled enough to get Bromsgrove Westerleigh to what it is now. Level crossings still causing the problems.
  13. T

    WCML Power Supply & Auto Transformer Upgrade

    807s are more power hungry, also factor in that NR are now probably at a point where they don't want to get perilously close to the limits.
  14. T

    HS2 Construction Updates - Birmingham Area

    Thats a permanent solution, it looks like the viaducts sit on the existing road.
  15. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    Its 100 HST from Bicester to Bletchley, id be amazed if that got dropped at this point when its effectively built. There is very little saving in it.
  16. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    That has the potential to bork the timetable then as you could only run 168s and a 196 will be quicker off the blocks.
  17. T

    How could the Elizabeth line expand?

    Its the other way around, TfL wouldn't want it themselves. They didnt want to pay for the proposed extension to Tring, which would have knackered the slow lines on the WCML.
  18. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    I will be. They certainly aren't running past Oxford in the short term.
  19. T

    Is the Heathrow Express a viable, worthwhile service?

    3 minute headways all over the place on the network. Its as low as 2 between Paddington and Reading in specific circumstances.
  20. T

    How could the Elizabeth line expand?

    How are you getting them to Paddington? There isn't any room on the reliefs.

Top