• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. S

    Oban to CRU

    CRU is the 3 letter designation of Falls of Cruachan station. Confusing that it is also being used for Craignure.
  2. S

    Central line - shortage of serviceable trains

    Thanks everyone for the replies. suspect that DC motors may not be being overhauled as the plan is to replace them but they are failing faster than they are being replaced
  3. S

    Central line - shortage of serviceable trains

    So they are not able to use any serviceable DC motors that come off trains being converted to AC motors or are there just not enough being replaced?
  4. S

    Central line - shortage of serviceable trains

    I assume it is the DC motors that are failing so with 5 trains at Acton being converted to AC motors I would expect that there should be 5 trains worth of DC motors available for use as spares at any one time? Or am I missing something. Confused..
  5. S

    TFL Contactless for child of 12?

    I am confused by the TFL website. My 12 year old granddaughter is travelling with her parents Wembley Park to South Kensington return off peak soon. A zip oyster is £15 which would give free travel but is expensive. Cash is £3.30 Adult contactless is £3.20 For simplicity, registering...
  6. S

    ECML incident between Morpeth & Newcastle (07/04)

    Saw London sleeper leave Newcastle empty? At about 10:30
  7. S

    It would be nonsensical to not grade-separate Wigston North Jn and four-track from there to Syston as part of the MML electrification programme.

    Is my memory playing tricks? Was there not a suggestion of switching the freight lines from west side to eat side happening north of Leicester? The main lines to use the east side island platform at Leicester and the slows using the west side island.
  8. S

    3rd rail infills and extensions may have a future after all…

    Can someone please explain why having both AC and DC together at Basingstoke is a problem please? I see both at the same platform at Ashford Kent with trains switching systems there.
  9. S

    EMR - Something new is coming

    Announcing the start of the process to refurbish the 360’s would have been worth the fuss, not just a mascot
  10. S

    Class 379 cascade: what BR would have done

    And Labour cancelled the channel tunnel…
  11. S

    Platforms of Last Resort

    Kings Cross Thameslink platforms retained for emergecies
  12. S

    Trivia: Electric Railways that closed

    Wimbledon to West Croydon. Converted to tram
  13. S

    Have VIP / Footplate rides recommenced at any heritage railways?

    Ecclesbourne Valley Railway at Wirksworth have.
  14. S

    Mesh WiFi networks?

    I used to use powerline but they needed rebooting fairly oftenand the Wi-Fi from them was not great. I now have 3 BT disks and not only is it a more stable setup but they cope with large number of devices unlike the Virgin hub (which now has its Wi-Fi switched off)
  15. S

    Could HS2 impact on MML electrification?

    Travelling to France, Kent, Gatwick or Brighton from Derby is one change at present. Do I want to go to Euston and then have to walk across London to get to St Pancras - no thank you! It will not be any quicker or easier. MML electrification will improve these journeys. Sheffield and further...
  16. S

    My proposal to get rid of 3rd rail and convert routes to overhead lines

    No I am not saying electrification should only be for freight, I am saying the main justification in this case is for freight from Southampton to Reading and beyond.
  17. S

    My proposal to get rid of 3rd rail and convert routes to overhead lines

    Electrification is for freight I believe, any passenger benefit is just icing on the cake if they make use of it
  18. S

    Class 701 'Aventra' trains for South Western Railway

    See https://www.railforums.co.uk/threads/swr-class-458-to-be-retained-by-swr.215775

Top