I notice that all the old platform edging stones have been removed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gledhill56

Member
Joined
12 Nov 2007
Messages
90
Ideally yes it should be moved for maximum flexibility, especially if trains were also reversing in pl.2, although other track changes would be required as well to allow that, namely a facing right-handed crossover on approach from Pontefract.
The planning application actually shows part of the platform to be demolished and being extended at the opposite end to give it a usable 120m length with the plan showing a re-sited signal about a 1/3 of the way down the existing platform.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,808
Location
Yorkshire
This thread is dedicated to discussing updates regarding actual infrastructure works; I have therefore split moved some recent posts into the pre-existing speculative thread to discuss potential service provision improvements.

Is this just for Transpennine Express to dump passengers for Leeds? No new service is planned for Castleford in reality is it?
Initially yes. But check out these threads for discussion regarding what might happen beyond that:
 

achmelvic

Member
Joined
23 Dec 2014
Messages
53
Apologies for the fading light. Taken just now on Friday 26th Nov

Are there any Network Rail plans to alter the track layout west of the station? Will current Northern services be able to use the reopened platform 2?
 

Attachments

  • D827F93B-0EE4-4BD1-BF65-92F774589CF0.jpeg
    D827F93B-0EE4-4BD1-BF65-92F774589CF0.jpeg
    4.6 MB · Views: 200
  • 15BB680C-6B67-4735-99F8-00D8C6CE0535.jpeg
    15BB680C-6B67-4735-99F8-00D8C6CE0535.jpeg
    4.1 MB · Views: 195
  • 2C35BC0C-BCC2-42F3-9C13-9F8DB2471C17.jpeg
    2C35BC0C-BCC2-42F3-9C13-9F8DB2471C17.jpeg
    4.1 MB · Views: 180
  • 178A9339-BF82-4E5A-9772-E5F7C08BD39F.jpeg
    178A9339-BF82-4E5A-9772-E5F7C08BD39F.jpeg
    4.6 MB · Views: 196
Last edited:

MarkyT

Established Member
Joined
20 May 2012
Messages
6,249
Location
Torbay
The planning application actually shows part of the platform to be demolished and being extended at the opposite end to give it a usable 120m length with the plan showing a re-sited signal about a 1/3 of the way down the existing platform.
That's about 60 to 70m clear of the crossover, enough for a free reduced or restricted overlap to accept trains into the new platform from the York direction at the same time a reversing movement over the junction is taking place.
 

johntea

Established Member
Joined
29 Dec 2010
Messages
2,602
On the subject of Castleford station they appear to be building quite a large structure at the moment on Platform 1 although it’s just a shell at the moment so no idea what (perhaps a cycle store?)

They’ve also dug up some of the car park but I assume that may just be utility companies performing maintenance
 

achmelvic

Member
Joined
23 Dec 2014
Messages
53
The structure is the base for the lifts & stairs for the overbridge afaik.
 

Attachments

  • 4E5E3F2F-858C-4CFF-81F4-6F320DF181F6.jpeg
    4E5E3F2F-858C-4CFF-81F4-6F320DF181F6.jpeg
    2.5 MB · Views: 132
  • A5FA17B4-DD5F-428D-8C04-AE7573C35C66.jpeg
    A5FA17B4-DD5F-428D-8C04-AE7573C35C66.jpeg
    4.2 MB · Views: 131

snowball

Established Member
Joined
4 Mar 2013
Messages
7,738
Location
Leeds
Consultation event on Monday


We’re delivering major improvements to Castleford station, including re-opening the platform that is currently out of use.

Castleford Station currently only has one platform in use, which restricts the number of trains that can use it. So that we can deliver the capacity to enable more trains to run, we will be rebuilding and re-opening the platform which is currently out of use and installing a new accessible footbridge to link it to the new station building and facilities.

In order to do this, our specialist teams carried out demolition work on the platform that was longer up to standard. The new platform is scheduled to be opened in late Autumn 2022.

The next major works taking place at the station will be in July 2022, when the new, accessible footbridge will be installed (artist impression below). This work will take place over select weekends, and we will aim to update everyone that the work will affect nearer the time.

In May 2022 we are starting work on the new footbridge foundations by drilling a series of piles into the ground on both platforms. These piles are being screwed into the ground (also known as ‘auger piling’) instead of being hammered into place. Whilst a certain amount of noise will be caused by this work, this is much less intrusive than hammer piling. Also, we will only be carrying out this work during the daytime.

We will be holding a public information event on Monday 23 May 2022, between 4pm and 7pm, at Trinity Methodist Church, Powell Street, Castleford, WF10 1EL, for you to come along, see our plans, and ask any questions you may have to members of the project team.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
7,941
Location
West Riding
I passed through the station last weekend and the second platform is really taking shape now :)
 

Class 170101

Established Member
Joined
1 Mar 2014
Messages
7,942
I guess the is no way to bring the seconsd platform back into use without the installation of lifts?
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
1,895
Location
Leeds
I guess the is no way to bring the seconsd platform back into use without the installation of lifts?
There's the subway (recently refurbished, after a fashion) but the ramps will be too steep for modern standards. Also depends if there's an entrance/exit being built off P2.
 

achmelvic

Member
Joined
23 Dec 2014
Messages
53
Plus the track work at Cutsyke mentioned on the TRU website linked above is needed before the existing Northern services can use the new platform to/from Glasshoughton & Pontefract.

What I'm not sure about is if the diverted services due to TRU will stop in Cas? as a local resident who often goes to York it'd be great to have direct services there even if only whilst the upgrade is happening but that's getting a bit off topic.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
1,895
Location
Leeds
What I'm not sure about is if the diverted services due to TRU will stop in Cas? as a local resident who often goes to York it'd be great to have direct services there even if only whilst the upgrade is happening but that's getting a bit off topic.
I wondered if P2 would be used only for coach transfers for passengers wanting to travel to Batley, Dewsbury, Ravensthorpe and Mirfield, with P1 being used for services as at present. Or vice versa, given that there's more space on that side for coaches to pick up and set down. That would effectively block one of the platforms with the train from/to York for long enough that both platforms couldn't be used. I don't suppose there would be anything stopping you from sneaking into a York-bound train, but good luck buying a ticket is it isn't supposed to pick up there :)
 

johntea

Established Member
Joined
29 Dec 2010
Messages
2,602
What works are taking place the next couple of Sundays?

Presumably track related as no rail services are running

Says there are further works in September and October to open the new platform
 
Last edited:

northernchris

Established Member
Joined
24 Jul 2011
Messages
1,509
What works are taking place the next couple of Sundays?

Presumably track related as no rail services are running

Says there are further works in September and October to open the new platform

Saw a poster at Leeds station today about this, seem to remember it's connected to a new footbridge being installed.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
6,249
Location
Torbay
I have made a short video animation showing possible typical usage patterns for the revised two platform station layout at Castleford. The new crossover at Cutsyke could allow trains from Pontefract to Leeds to use new platform 2 to reverse routinely, while Leeds to Pontefract trains continue to use platform 1.
 

jp4712

Member
Joined
1 May 2009
Messages
470
This was the overall view at Castleford today.
 

Attachments

  • 159792A1-B586-476B-8685-BACBF56729F4.jpeg
    159792A1-B586-476B-8685-BACBF56729F4.jpeg
    2.5 MB · Views: 170

johntea

Established Member
Joined
29 Dec 2010
Messages
2,602
Must be some pretty serious works taking place the next couple of Saturdays as the entire car park is fenced off!
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
5,321
Must be some pretty serious works taking place the next couple of Saturdays as the entire car park is fenced off!
Not long now until the second platform opens. I've seen a date (but honestly can't remember it!) so can't imagine it'll be long before the bridge goes in.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
1,895
Location
Leeds
Not long now until the second platform opens. I've seen a date (but honestly can't remember it!) so can't imagine it'll be long before the bridge goes in.
If TPE are running their new service from the May 2023 timetable... there's time yet. Just depends if Northern want to use it in the interim :D
 

Class 170101

Established Member
Joined
1 Mar 2014
Messages
7,942
Some late night (post 22:00) and early morning (pre 06:00) services running via this route from December, but not stopping.
 
Joined
15 Apr 2020
Messages
316
Location
Wakefield
These late night diversions have run many weeks already depending on what works are happening on the route, it doesn’t look like this is much different from December to be honest
 

Class 170101

Established Member
Joined
1 Mar 2014
Messages
7,942
What would passenger demand be like at those times?
Not sure what you are getting at here. Its a diversion for York to Leeds and Hull to Leeds services, presumably to allow either electrification or other engineering works to take place.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
7,738
Location
Leeds
Nobody has posted this press release yet:


Reopening Castleford rail station’s second platform moves a step closer this October, after being closed for more than 20 years, to boost capacity and reliability for passengers.

The new platform, which is being fully rebuilt, will be served by an accessible footbridge with stairs and lifts to link it to the recently improved station building and facilities.

The second platform – which hasn’t welcomed regular train services since the 1970s - will improve the reliability of existing services and increase capacity, allowing more trains to run through Castleford.

For decades passengers have used a single platform to travel in both directions from the town. This often causes delays for trains trying to enter the station.

Engineers have already started prepping the station for this final phase of the major upgrade, with work successfully getting underway on Sunday 16 October.

The new footbridge will be lifted into place over two weekends in October, with work to complete the track improvements and signalling upgrade taking place over three days between Friday 28 to Sunday 30 October, during which time services will be diverted and will not call at Castleford.

Upgrades will also take place on Sunday 23 October when fewer trains will run through the station. Buses will replace some rail services through the town and passengers are encouraged to check both their outward and return journeys on the National Rail Enquiries website before they travel.

A new crossover has already been installed at Cutsyke to the west of the station to allow trains to use either platform, together with a new signalling system in the area, enabling more trains to run.

This work is being delivered as part of the Transpennine Route Upgrade, which will enable the use of the Castleford line to divert trains and keep passengers moving during major upgrades on the main line between York and Leeds.

Following final completion of work, the new platform and footbridge will open in 2023.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
1,895
Location
Leeds
Nobody has posted this press release yet:

That's annoying. If I'm on P2 and want to head south, I have to head north over the footbridge, then back underneath through the underpass (as now) - I can't see an exit/entrance marked on that image.
 

johntea

Established Member
Joined
29 Dec 2010
Messages
2,602
Not the greatest picture taken by yours truly but the structure for the new lifts and footbridge has started to take shape it seems