GWR Class 769 information. (Units no longer with GWR - Off Lease March 23)

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,286
Location
Between Edinburgh and Exeter
No. Not in the public domain or it would have been posted. The fact that they are still only going out three days a week, if that, might suggest that it isn't imminent.
Adding to this, I don't believe all members of the fleet have received their ADSO fitment yet. Though it is progressing, slowly, with units cycling through Eastleigh Works.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,782
Adding to this, I don't believe all members of the fleet have received their ADSO fitment yet. Though it is progressing, slowly, with units cycling through Eastleigh Works.
Would that, of itself, matter? It isn't as if the whole fleet would go into service on day one - the two introduction schedules in the public domain have both been over the course of a nine or ten month period. There are still units that haven't been to Reading, let alone Eastleigh for the ASDO work.

Far more critical would seem to be that there has been no obvious uptick in training runs. The three-weekly trips to Gatwick (Maidenhead and Didcot last Wednesday) are still going in the timetable on a STP basis each week which doesn't give the (external) appearance of a squadron training plan.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
1,640
Location
South Staffordshire
Would that, of itself, matter? It isn't as if the whole fleet would go into service on day one - the two introduction schedules in the public domain have both been over the course of a nine or ten month period. There are still units that haven't been to Reading, let alone Eastleigh for the ASDO work.

Far more critical would seem to be that there has been no obvious uptick in training runs. The three-weekly trips to Gatwick (Maidenhead and Didcot last Wednesday) are still going in the timetable on a STP basis each week which doesn't give the (external) appearance of a squadron training plan.

I imagine the crew will need training on the ASDO equipment, so the training units and their "T Bird" rescuers need to be ASDO equipped.

Hadn't realised the extra link in the conversion chain. So they were parked at Long Maraton, hauled to Wolverton for the general overhaul, then hauled to Loughborough for the diesels, then hauled back to Wolverton, then to Eastleigh, then back to Reading.
 

FenMan

Established Member
Joined
13 Oct 2011
Messages
1,372

DownFast

Member
Joined
30 Sep 2021
Messages
41
Location
UK
Is there any sign of crew training commencing? The two or three times a week running various units up and down the North Downs Line says GWR are being extremely careful, given the well-documented problems elsewhere. Fair enough, so the cascade plan for the Turbos is where exactly?
Commencement of driver training is subject to ongoing discussions with ASLEF DDC on acceptance of the units. These discussions have been lengthy but are heading in the right direction.
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,444

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
1,882
Hi all,
Can we just update generally where we are with the GWR 769s? Are we expecting them in service soon and are they being tested daily etc?
Thanks,
 

Caaardiff

Member
Joined
9 Jun 2019
Messages
867
Do GWR have any backup if these never make it into service?
TfW ordered theirs as a stop gap until the new fleet arrives for the Rhymney line(756's). It now seems the 231's which have already started testing will run in place of the 769's until the 756's arrive, as they are looking to get shot of them asap, or at least reduce their usage dramatically due to reliability issues.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
2,728
Location
81E
Hi all,
Can we just update generally where we are with the GWR 769s? Are we expecting them in service soon and are they being tested daily etc?
Thanks,

Many thanks, are we into the driver training phase yet? Can you seem on runs from Reading?

The Mileage Accumulation (MA) runs are Monday, Wednesday & Friday. They normal path is depart Reading TCD at 0915 to Gatwick, returning to Reading TCD at 1524. These runs may also start and/or finish at Oxford Carriage Sidings. There can also be ad-hoc paths for moves between Reading/Oxford and Arlington at Eastleigh.

Initially the MA was undertaken by COLAS drivers but recently they have been used to train Managers (competency managers etc). The initial driver course started either last week or its starting this week.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,782
Do GWR have any backup if these never make it into service?
There is already a backup in place (eg the 16 3-car 165s). These are earmarked for services in the Bristol area but have been operating the services intended for the 769s over the last three years.
 

DownFast

Member
Joined
30 Sep 2021
Messages
41
Location
UK
Many thanks, are we into the driver training phase yet? Can you seem on runs from Reading?
First question: Not yet. Training of driver standards managers and driver learning managers (driver trainers) has begun, with about 6 or so people competent, but training of drivers can only begin once agreement has been reached with ASLEF on acceptance of the units and that hasn't happened yet. The first driver course was due to start today but has been postponed.

Second question: Yes. But reliability has been problematic (e.g. one unit failed at Guildford last week, and the rescue train had problems too at Wokingham).
 

Bob Price

Member
Joined
8 Aug 2019
Messages
1,034
Reliability on the Welsh valleys has been bad. They seem to work well on electric but the diesel elements are a problem. TfW can't wait to get rid of theirs and are possibly putting the 231's up the Rhymney until their Tri modes are delivered. Introducing new trains in the north will also free up 153's and 150's. Don't be surprised if they don't have a long life with GWR.
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,254
Location
UK
Reliability on the Welsh valleys has been bad. They seem to work well on electric but the diesel elements are a problem. TfW can't wait to get rid of theirs and are possibly putting the 231's up the Rhymney until their Tri modes are delivered. Introducing new trains in the north will also free up 153's and 150's. Don't be surprised if they don't have a long life with GWR.
With the 365s being scrapped and the 319s having their life extended as 769s, it absolutely boggles the mind. At this rate, it would’ve been faster and better to order brand new bi/tri-modes…
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,782
With the 365s being scrapped and the 319s having their life extended as 769s, it absolutely boggles the mind. At this rate, it would’ve been faster and better to order brand new bi/tri-modes…
...or just stick with the current 165s. I'd imagine the money wasn't on the table for brand new vehicles. The planned 769 operation isn't on highly remunerative routes.

There was a proposed frequency increase on those routes but that is now cancelled. In hindsight, in the light of the events since March 2020, it would seem that GWR wouldn't have bothered but it seemed a reasonable idea at the time. As you say, the mind boggles as to why the programme hasn't been cancelled given where we are now, the expected need for savings and service reductions from May 2022, and with a training programme that could yet be culled without lots of effort having been expended.

This isn't intended to belittle the efforts of GWR and its staff to do the best by these units over the last year but sometimes a line just has to be drawn and what seems like a good idea stopped before it becomes a liability.
 
Last edited:

AM9

Veteran Member
Joined
13 May 2014
Messages
14,263
Location
St Albans
With the 365s being scrapped and the 319s having their life extended as 769s, it absolutely boggles the mind. At this rate, it would’ve been faster and better to order brand new bi/tri-modes…
My feeling as well, but they didn't and went and ordered diesel only trains from CAF and locked at least three areas into running CO2 generators under wires for at least 30 years. At least the 769s will be able to run as electrics where OLE* is available.

* and 3rd rail for GWR.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,286
Location
Between Edinburgh and Exeter
...or just stick with the current 165s. I'd imagine the money wasn't on the table for brand new vehicles. The planned 769 operation isn't on highly remunerative routes.

There was a proposed frequency increase on those routes but that is now cancelled. In hindsight, in the light of the events since March 2020, it would seem that GWR wouldn't have bothered but it seemed a reasonable idea at the time. As you say, the mind boggles as to why the programme hasn't been cancelled given where we are now, the expected need for savings and service reductions from May 2022, and with a training programme that could yet be culled without lots of effort having been expended.

This isn't intended to belittle the efforts of GWR and its staff to do the best by these units over the last year but sometimes a line just has to be drawn and what seems like a good idea stopped before it becomes a liability.
To be frank, after the Northern debacle, I’m surprised GWR chose to stick with theirs. Considering Porterbrook aimed this as a cheaper and quicker alternative to purchasing a new build unit, nearly 6 years on from the first order (Northern) we are no nearer to getting the GW units into service. This whole business really has proven that, you need to build and test a prototype design, before you allow orders to be placed on it.
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,254
Location
UK
To be frank, after the Northern debacle, I’m surprised GWR chose to stick with theirs. Considering Porterbrook aimed this as a cheaper and quicker alternative to purchasing a new build unit, nearly 6 years on from the first order (Northern) we are no nearer to getting the GW units into service. This whole business really has proven that, you need to build and test a prototype design, before you allow orders to be placed on it.
I’d say the Aventras are just as good an example of this…
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
6,107
Location
Surrey
They'd be better sticking batteries under these as the NDL is ideal with its multiple sections of 3rd rail to both power the units and recharge the batteries.
 

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
1,882
The Mileage Accumulation (MA) runs are Monday, Wednesday & Friday. They normal path is depart Reading TCD at 0915 to Gatwick, returning to Reading TCD at 1524. These runs may also start and/or finish at Oxford Carriage Sidings. There can also be ad-hoc paths for moves between Reading/Oxford and Arlington at Eastleigh.

Initially the MA was undertaken by COLAS drivers but recently they have been used to train Managers (competency managers etc). The initial driver course started either last week or its starting this week.
Many thanks for the info about Mileage Accumulation, it doesn't look like there are any planned movements this week.
 