Has anyone heard any news about the closure of Sandhills IECC (Integrated Electronic Control Centre), which controls the majority of the signalling for the Merseyrail network.
I saw it listed on another site as planned signalling alterations in 2020, with the areas signalling being relocated to West Coast North Regional Operations Centre in Manchester.
Does anyone know if this is correct and if so when this year this is planned to take place?
I saw it listed on another site as planned signalling alterations in 2020, with the areas signalling being relocated to West Coast North Regional Operations Centre in Manchester.
Does anyone know if this is correct and if so when this year this is planned to take place?