Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
We’re installing the tracks through our new dive-under tunnel at #Werrington near Peterborough.
Once opened, this key part of our #EastCoastUpgrade will enable freight trains to dive under the East Coast Main Line instead of crossing it, making room for more passenger trains
East Coast Upgrade on Twitter: "With the first track installed, here’s the very first locomotive to run through our new dive-under tunnel beneath the East Coast Main Line at #Werrington. After the second line is installed, tampers will ensure both tracks are correctly aligned. #EastCoastUpgrade https://t.co/Bdw0kR5Uzi" / Twitter
We’re installing the second track through our new tunnel at #Werrington.
⚠️There are no @CrossCountryUK or @EastMidRailway trains between Leicester, Stamford & Peterborough this weekend while we connect these new tracks into the rest of the network.