Sydney trains has been kind enough to put some virtual train trips on their facebook page. Enjoy

Woy Woy to Hornsby

South Coast line

Mount Victoria to Springwood
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LesS

Member
Joined
24 Apr 2012
Messages
159
Location
Sydney
Thank you for posting these.
Here is some info for UK railfans.

Woy Woy to Hornsby:
This is a section of the "Central Coast Line". The line covers the 100 miles from Sydney to the major industrial and Port city of Newcastle. Local railfans usually refer to it as "the short north". The long tunnel is Woy Woy Tunnel at 1 mile. From Hawkesbury River station there is a 5 mile climb at 1in30 to1in40 as far as Cowan. This is always punishing on trains and failures by freight trains continues to be far too frequent. The train featured appears to be the 7.39am departure commencing from Gosford. On the approach to Hornsby the train was crossed from the UP Main to the UP Loop. This leads directly into platform 1 and onto the North Shore line and avoids conflicting movements. The train continues to the city via the Harbour Bridge and city underground. The trainset is an 8 car H set. Mid journey our version of an HST set was passed. This was train NT33 Sydney to Casino with road connections to the Northern Rivers district, Gold Coast and Brisbane. The full run to Brisbane has always been a favourite of mine. It will arrive in Casino about 6.00pm.

South Coast:
This is from Kiama to Bomaderry. This is the station for the regional city of Nowra which is on the opposite bank of the Shoalhaven River. Kiama is 74 miles from Sydney and the end of the electrified line. The final 25 miles is served by 2car DMU sets. The high mounted yellow triangles are permanent distant signals.

Mt Victoria to Springwood:
This covers the high section of the Blue Mountains. The train is an 8 car V set which is too long for many of the platforms. At these it stops at the 8v stop boards. The service is the 6.45am departure from Mt Victoria and the video commences from one of the storage and reversal sidings at Mt Victoria. Mt Victoria is 3424ft above sea level. The station platforms once had large refreshment rooms and both platforms. The first floor on the down platform once provided accommodation. This are is now a museum. The video does not identify the stations. Here they are in order:
Mt Victoria, Blackheath, Medlow Bath, Katoomba, Leura, Wentworth Falls. Bullaburra, Lawson, Hazelbrook, Woodford, Linden, Faulconbridge, Springwood.
At Medlow Bath a large white building is visible on the right of the screen. This is the Hydro Majestic Hotel. It is perched on the edge of the cliff with spectacular views over the Megalong Valley.
The line is fairly level to Katoomba and then is 1in30 descending all the way to Springwood. Driving skills are always very important on these services.
 

SLTRegular

Member
Joined
12 Apr 2021
Messages
39
Location
Penrith
Technically these are New South Wales Trainlink services as They are all outside the Sydney City rail network. Limits are Hornsby Waterfall and Emu Plains on those respective lines.
 

Greetlander

Member
Joined
3 Mar 2018
Messages
184
Location
Sydney, Australia
Thank you for posting these.
Here is some info for UK railfans.

Woy Woy to Hornsby:
This is a section of the "Central Coast Line". The line covers the 100 miles from Sydney to the major industrial and Port city of Newcastle. Local railfans usually refer to it as "the short north". The long tunnel is Woy Woy Tunnel at 1 mile. From Hawkesbury River station there is a 5 mile climb at 1in30 to1in40 as far as Cowan. This is always punishing on trains and failures by freight trains continues to be far too frequent. The train featured appears to be the 7.39am departure commencing from Gosford. On the approach to Hornsby the train was crossed from the UP Main to the UP Loop. This leads directly into platform 1 and onto the North Shore line and avoids conflicting movements. The train continues to the city via the Harbour Bridge and city underground. The trainset is an 8 car H set. Mid journey our version of an HST set was passed. This was train NT33 Sydney to Casino with road connections to the Northern Rivers district, Gold Coast and Brisbane. The full run to Brisbane has always been a favourite of mine. It will arrive in Casino about 6.00pm.

South Coast:
This is from Kiama to Bomaderry. This is the station for the regional city of Nowra which is on the opposite bank of the Shoalhaven River. Kiama is 74 miles from Sydney and the end of the electrified line. The final 25 miles is served by 2car DMU sets. The high mounted yellow triangles are permanent distant signals.

Mt Victoria to Springwood:
This covers the high section of the Blue Mountains. The train is an 8 car V set which is too long for many of the platforms. At these it stops at the 8v stop boards. The service is the 6.45am departure from Mt Victoria and the video commences from one of the storage and reversal sidings at Mt Victoria. Mt Victoria is 3424ft above sea level. The station platforms once had large refreshment rooms and both platforms. The first floor on the down platform once provided accommodation. This are is now a museum. The video does not identify the stations. Here they are in order:
Mt Victoria, Blackheath, Medlow Bath, Katoomba, Leura, Wentworth Falls. Bullaburra, Lawson, Hazelbrook, Woodford, Linden, Faulconbridge, Springwood.
At Medlow Bath a large white building is visible on the right of the screen. This is the Hydro Majestic Hotel. It is perched on the edge of the cliff with spectacular views over the Megalong Valley.
The line is fairly level to Katoomba and then is 1in30 descending all the way to Springwood. Driving skills are always very important on these services.
Should add as well that anyone with a longing for Woodhead might find the Blue Mountains line a little comforting. Electrified at 1500vdc, with a ton of original 50s catenary well into the rusting process.

Gosford to Berowra is pretty useless as a main line, but a glorious run if you don't want to be anywhere quickly.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,469
Location
Glasgow
Should add as well that anyone with a longing for Woodhead might find the Blue Mountains line a little comforting. Electrified at 1500vdc, with a ton of original 50s catenary well into the rusting process.
With the 46s around it pretty much was Woodhead :E
 

route101

Established Member
Joined
16 May 2010
Messages
10,613
Been to Katoomba , gets chilly up there in winter. The system around Sydney is vast. I did notice the old catenary.
 

jedimasterc

Member
Joined
9 Jan 2021
Messages
21
Location
Sydney, Australia
The old cantenary is in the process of being replaced. The bushfires accelerated replacement in certain sections of the track and even right at the start of the mt victoria line you can see new poles ready to replace the old stuff nearby.
 

SLTRegular

Member
Joined
12 Apr 2021
Messages
39
Location
Penrith
There's some work on the eastern side of Penrith Station also but I guess this could be for quadrification of St Marys to Penrith also?
 

Addington

Member
Joined
4 Sep 2009
Messages
52
Location
Sydney, Australia
There's some work on the eastern side of Penrith Station also but I guess this could be for quadrification of St Marys to Penrith also?
Quadding of the line west to Penrith was started from Westmead in the 1940's but the project was shelved once the four tracks got to Seven Hills, it took another forty years to extend to St Marys. Westmead to Granville was the final (and hardest) section to quad as the track configuration had to go from Up/Down/Up/Down at Granville to Up/Up/Down/Down at Westmead.

When the line was electrified, the stauchions were were placed to accommodation the four tracks that never happened. There are also sections on the blue mountains that also have staunchions for four tracks. Loops were going to be put in place for overtaking movements until they discovered that 46's sped the freights up to a point where overtaking moves weren't needed.
 

Greetlander

Member
Joined
3 Mar 2018
Messages
184
Location
Sydney, Australia
Quadding of the line west to Penrith was started from Westmead in the 1940's but the project was shelved once the four tracks got to Seven Hills, it took another forty years to extend to St Marys. Westmead to Granville was the final (and hardest) section to quad as the track configuration had to go from Up/Down/Up/Down at Granville to Up/Up/Down/Down at Westmead.

When the line was electrified, the stauchions were were placed to accommodation the four tracks that never happened. There are also sections on the blue mountains that also have staunchions for four tracks. Loops were going to be put in place for overtaking movements until they discovered that 46's sped the freights up to a point where overtaking moves weren't needed.
Oh wow - I always assumed that the oversized stanchions had their extra tracks removed. They never had them?

These are the ones I'm thinking of
Screen Shot 2021-08-19 at 10.28.37 pm.png
 
Last edited:

SLTRegular

Member
Joined
12 Apr 2021
Messages
39
Location
Penrith
Penrith-St Marys is being Quarupled but no date has been set and its even more silly as they've just finished Kingswood Refurbishment. The next Daft decision was the New St Marys to Aerotropolis line there building
 

Addington

Member
Joined
4 Sep 2009
Messages
52
Location
Sydney, Australia
That's correct, Woodford would have been planned but never built. At this location they would have been able to take advantage of the unused original single track alignment.
 