I am interested if anyone has any documents / memories of what the journey times / frequencies would have being had PUG2 completed and the WCML was running with moving block signals at 140mph (something that would probably still be challenging to do if it was attempted again today)
Was London - Glasgow all proposed to be under 4 hours?
Was London - Manchester / Liverpool proposed to be under 2 hours?
From my memory the frequencies were proposed to be about the same as now, but I don't recall the journey times.