Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Acton main line as no barriers, and as access 24 hrs every day. Willesden junction station closed after last train, but there is a public footbridge over the WCML, parallel to the north London Line on the overground depot side. 266 bus runs throughout the night between the the two stations...
The construction site you saw, is to do with the electrification works of the goblin line.
when finished the construction site will be cleared. There is no planned connection between the two lines.
The Irish railway society hold an event once a year, at Chiswick town hall London W4. About 40 - 45 stalls selling railwayana. Their next event is on 1st April 2017.
Still running as single unit formation due to platform length at Gospel oak, which will be lengthen during the next phase of closure. Willesden high level over looks the tmd, any 172's not in use may be stabled in open.
16th may, planned first day, link below is trains stopping at lea bridge.
http://www.realtimetrains.co.uk/search/advanced/LEB/2016/05/16/0000-2359?stp=WVS&show=all&order=wtt
According to the local newspaper it was a electrical fire, because of the smoke it was enough to evacuate the station. due to the consist being across the points that link the nll and goblin line, another freight train waiting to go onto the nll line and over the points that allow the units to...