The "Top Shed" has been included in the Atkins Feasibility Study, which, if approved, GCR/GCRN will get the funding to:
Bridge "The Gap", including refurbished bridge above canal, and bridge over the MML. Also, a link to "Top Shed" will be provided. Remove old Loughborough Shed.
Rebuild...