• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. rower40

    Manchester United’s rail freight dilemma

    How dare you, sir? To the North-West (home of the quote about Football not being a matter of life and death, but much much more important than that) nothing can contribute to the industrial and commercial needs of the region more than 22 grown men chasing a ball. It’s like telling an inhabitant...
  2. rower40

    Redundant routes?

    In many instances (Romford Down Main springs to mind) the loop is removed, the points are replaced by plain track, the signal is bagged, and all the Network Change procedures are carried out - but then the signal, points and tracks are still left in the interlocking, with the point detection...
  3. rower40

    Vegetation growing out of control?

    And to provide a cost-effective alternative to carriage washing machines. And, as noted before, to block that pesky gap between Elizabeth Line train and platform at Ealing Broadway platform 4. And obscured signals will be a thing of the past with ETCS.
  4. rower40

    Elizabeth Line Platform Gaps - BBC News

    If buses can lower their air suspension to let mobility-impaired riders off and on, why not trains?
  5. rower40

    Transpennine Route Upgrade and Electrification updates

    That’s the safe distance when the wires are NOT energised :rolleyes:
  6. rower40

    WCML Derailment in Cumbria - 29th May 2024

    Another risk with ‘squeezing through’ next to derailed wagons (e.g. with a 5mph ESR) is this: there’s less certainty that the wagons will stay put when the trackbed is jostled by each passing train. When the wagons are still on the rails, it becomes easier to guarantee that they won’t move sideways.
  7. rower40

    WCML Derailment in Cumbria - 29th May 2024

    Possibly related to Edwin's comment yesterday about staff being less familiar with unexpected/unusual occurrences; there could be a scarcity of MOMs trained to operate those crossovers.
  8. rower40

    WCML Derailment in Cumbria - 29th May 2024

    Last night's sleepers appear to be, erm, a bit disrupted. The Up Highland Sleeper 1M16 is currently 292 mins late, and hasn't yet reached the M25 (as I write at 1213 hrs) for a booked 0800 arrival in Euston.
  9. rower40

    Prime Minister on Night Riviera (28/05)

    Agreed. The local TV coverage in the South-West last night showed the soon-to-be-ex-PM disembarking at Penzance, rather than embarking at Paddington; the latter would have given the would-be-assassins/protestors/miscreants/lobbyists (in no particular order) lots of time to plan their actions...
  10. rower40

    Levenmouth rail link to reopen: project updates

    Gratuitous use of bagpipes is a safe bet.
  11. rower40

    Hunting on HS1 in london tunnel Westbound between Ebbsfleet and Stratford

    If only we had a centre-of-excellence that could come into being to determine the causes of high-speed derailments, identify the underlying physics of the rail-wheel interface, and design whole new families of wheels and bogies to alter rail travel for a generation. Oh, wait. We did. It shut.
  12. rower40

    Prime Minister on Night Riviera (28/05)

    I appear to have had a lucky escape! I was to have taken that train last night, but instead went west during the afternoon/evening of the previous day (1V60 direct from Derby to Bodmin Parkway - and mirabile dictu it didn't get cancelled at Plymouth), and stayed overnight in a fixed, rather...
  13. rower40

    Transpennine Route Upgrade and Electrification updates

    The link you sent was for 23rd May. Today, it left from Leeds. With me on it! Train Manager tells me that "It's going to be a fun week" - as, apart from the odd starter/terminator, Cross Country aren't serving Leeds, so the crew based there have to travel passenger on other operators'...
  14. rower40

    Transpennine Route Upgrade and Electrification updates

    How long is Micklefield to Church Fenton shut for? I usually catch 1V46 (0645) from York on a Tuesday, but today it starts from Leeds, so I’ve had to get up early for 1P58 (0620) to connect.
  15. rower40

    Mind the gap errm I mean...Plant. At what point does the railway decide it's time for a trim of the plant growth on the line?

    Does the plant help to fill that tricky gap between platform and train? A solution to the Ealing Broadway problem?
  16. rower40

    Multiple trains one after the other cancelled due to 'staff shortages'

    "Staff Shortages"? Just employ taller staff. Or get the short ones a booster seat or similar. (This post may contain traces of not taking the problem seriously. Mea Culpa.)
  17. rower40

    Elizabeth Line Platform Gaps - BBC News

    Ealing Broadway is the first Elizabeth Line station to the west of the Central core that freight trains go through the platforms (on a regular basis). Does that have some bearing on the positioning of the platform? I'm not maybe as au fait as others here with the relative loading gauge of...
  18. rower40

    Mobile Phone Coverage on Main Lines

    I’m continually impressed that the mobile phone system can cope with an entire trainload of phones being handed over from one cell to the next, and the next, at 125mph or above.
  19. rower40

    Terminating points on WAML

    Same as the Harlow Town crossovers. No signalled routes over them, but can be used for handsignalled/unsignalled moves or within a possession.

Top