They increased the frequency of the Liverpool services on weekdays during peak time, alongside all day on Saturdays. As a result, the previous 1tph 8 car service went down to 2tph 4 car, increasing the frequency, but keeping capacity the same. The 10 350s from TPE helped with the Chase Line...