Electrical faults through out the train with multiple coaches having no air con working.The above was cancelled at Doncaster, where it was not due to call, due to a problem with the train. Does anyone have any more details?
Thanks. They dropped the pan at York and started the diesel engines, it stood for 20 mins and then they turned off the diesels and raised the pan again.Electrical faults through out the train with multiple coaches having no air con working.
Conditions on the train were not pleasant.
They believed they could reciting fault by operating the diesel engines vice electric, however that did not rectify the fault.Thanks. They dropped the pan at York and started the diesel engines, it stood for 20 mins and then they turned off the diesels and raised the pan again.
It then departed. In the meantime the following semi-fast service came into York and departed before it, but i never noticed anyone swap onto it.
Thanks, that's cleared it up for me.They believed they could reciting fault by operating the diesel engines vice electric, however that did not rectify the fault.