Castle Cary

Status
Not open for further replies.

Hartington

Member
Joined
5 Jul 2013
Messages
165
The new (east) car park has opened. 193 new spaces (but when I used it last thursday there were a few roped off in one corner). The old car park is still open and both are heavily used.

In the GWR news announcing the opening there is a paragraph:

"““We’re not stopping there. We are forwarding plans for an accessible lift bridge at the station, providing funding to Network Rail to help develop designs.””"

The old footbridge has been reinstated and I can't see them adding conventional lifts. A scaffolding footbridge has gone up for Glastonbury traffic just recently (and is noticeably higher then the old bridge).

I'm a bit intrigued by the idea of "“an accessible lift bridge". Anyone know?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

stuu

Established Member
Joined
2 Sep 2011
Messages
3,403
The new (east) car park has opened. 193 new spaces (but when I used it last thursday there were a few roped off in one corner). The old car park is still open and both are heavily used.

In the GWR news announcing the opening there is a paragraph:

"““We’re not stopping there. We are forwarding plans for an accessible lift bridge at the station, providing funding to Network Rail to help develop designs.””"

The old footbridge has been reinstated and I can't see them adding conventional lifts. A scaffolding footbridge has gone up for Glastonbury traffic just recently (and is noticeably higher then the old bridge).

I'm a bit intrigued by the idea of "“an accessible lift bridge". Anyone know?
I wouldn't get excited, it's just badly worded. They mean a bridge with lifts, not a mini-Tower Bridge or something
 

Gloster

Established Member
Joined
4 Sep 2020
Messages
10,635
Location
Up the creek
I wouldn't get excited, it's just badly worded. They mean a bridge with lifts, not a mini-Tower Bridge or something

Presumably with lifts that are large enough and powerful enough to cope with mobility scooters. All you have to do then is get up the path to town or fight through the drivers on Station Road.
 

Hartington

Member
Joined
5 Jul 2013
Messages
165
I wouldn't get excited, it's just badly worded. They mean a bridge with lifts, not a mini-Tower Bridge or something
Do you have a source for that? They have only just completed the refurbishment of the existing footbridge amd they haven't raised it to allow future electrification (unlikely but that seems to be the norm). Every accessible footbridge I've seen built new in recent years has allowed for electrification.
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
4,056
Location
The West Country
I expect the old bridge has grandfather rights so replaced to its original height. The temporary footbridge being “new” probably has to be built to modern standards hence high enough for electrification,much like the previous temporary bridge.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
2,347
Location
Bath
Do you have a source for that? They have only just completed the refurbishment of the existing footbridge amd they haven't raised it to allow future electrification (unlikely but that seems to be the norm). Every accessible footbridge I've seen built new in recent years has allowed for electrification.
I think the farce where they restored at least 2 station bridges in the Thames Valley, then tore them down less than a year later because they were too short to electrify, shows there isn't that much forward thinking.
 

Oxfordblues

Member
Joined
22 Dec 2013
Messages
847
The wording is terrible: "We're not stopping there" suggests trains are flying through the station!
 

Hartington

Member
Joined
5 Jul 2013
Messages
165
"The Creanery" has opened.

A word of explanation - just behind the station building there used to be a milk factory. In recent (ish) years it's been a wine merchant amongst other things.

A little outside Castle Cary, on the road to Bruton, is the estate attached to Hadspen House. It has been significantly developed and renamed as "The Newt in Somerset". A room in the old house (now a boutique hotel) on 17th July for two
nights will cost you £1850.00!

Anyway, they purchased the old milk factory and completely rebuilt it and renamed it as "The Creamery". Follow this link and you will see how they are marketing it. They have a restaurant (I think their idea of "trackside" is not the same as mine) which, if experience on the estate is anything to go by, will good but expensive. However, you can also buy take away coffee etc. just beware that their pain au chocolate and croissant are large, tasty and flaky!

It will be interesting to see how it manages under the Glastonbury onslaught!
 

Gloster

Established Member
Joined
4 Sep 2020
Messages
10,635
Location
Up the creek
Looking at Google maps it seems that they have pretty well gutted it. The loco in the artist’s impression, very much of an impression, looks more like something that fell off the S&D rather than a GWR type.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
14,978
Location
Bristol
Do you have a source for that? They have only just completed the refurbishment of the existing footbridge amd they haven't raised it to allow future electrification (unlikely but that seems to be the norm).
Do they need to? This photo: https://en.wikipedia.org/wiki/Castle_Cary_railway_station#/media/File:165132_Castle_Cary.jpg on Wikipedia of what I think is the footbridge you're referring to appears to have sufficient headroom to get wires through, even if it is below standard.
I expect the old bridge has grandfather rights so replaced to its original height. The temporary footbridge being “new” probably has to be built to modern standards hence high enough for electrification,much like the previous temporary bridge.
From looking at pictures the temporary footbridge appears to be of a standard design that would have sufficient clearance for OLE from the ground rather than the platform. Using a standard modular design would help keep costs down a little bit, rather than adjusting the height to each location. (linked picture shows train passing under the footbridge with Glastonbury crowd using bridge, from a Metro article).
 