I was going to reply to an old thread but it's closed.
<<28/5/2024
The escalators between the low level station entrance and the main station have been closed for about two months.
29/5/2024
I would refer the right honourable member to transport for London's escalators and works closures pages on their website where you will see that some of their projects can take a year or more to complete. And whilst this doesn't sound like it was amazingly well planned for a high use high traffic escalator Bank like that, it's not going to be a quick job. I wouldn't have thought
29/5/2025
It does seem to be a pretty substantial rebuild of the escalators, which were getting on a bit.>>
On Friday the up escalator (between the entrance to the low level station and the mainline station) was open .
<<28/5/2024
The escalators between the low level station entrance and the main station have been closed for about two months.
29/5/2024
I would refer the right honourable member to transport for London's escalators and works closures pages on their website where you will see that some of their projects can take a year or more to complete. And whilst this doesn't sound like it was amazingly well planned for a high use high traffic escalator Bank like that, it's not going to be a quick job. I wouldn't have thought
29/5/2025
It does seem to be a pretty substantial rebuild of the escalators, which were getting on a bit.>>
On Friday the up escalator (between the entrance to the low level station and the mainline station) was open .