I've loosely noticed that platforms 11 and 12 at Manchester Picc don't seem to be heavily used compared to the other platforms and was thinking whether they or the space could be put to better use?
Would it be possible to convert these to through-line platforms, by diverting the tracks to the south slightly so that they run closer and more parallel to 13 and 14? I don't know if this would be easier and cheaper than the 15 and 16 project, but just wondered given that 1. they don't seem to be occupied that often over the hour and 2. there is more capacity available over platforms 1-10 because of the TPE Ordsall Chord diversions.
I realise this would require a junction with the existing through line a bit further west and that some of the old shed brickwork would probably have to be knocked through, but what is the feasibility?
Would it be possible to convert these to through-line platforms, by diverting the tracks to the south slightly so that they run closer and more parallel to 13 and 14? I don't know if this would be easier and cheaper than the 15 and 16 project, but just wondered given that 1. they don't seem to be occupied that often over the hour and 2. there is more capacity available over platforms 1-10 because of the TPE Ordsall Chord diversions.
I realise this would require a junction with the existing through line a bit further west and that some of the old shed brickwork would probably have to be knocked through, but what is the feasibility?