The planning application for the Seaforth Railhead extension application No DC/2023/01392 from 07 Aug 2023. The first link is the plan of the site whilst the second link is the full application.
Boundary (sefton.gov.uk)
DC/2023/01392 | Certificate of lawfulness for the proposed improvements to existing rail links and access roads at Seaforth Dock | Seaforth Dock - Liverpool (sefton.gov.uk)
Interesting to note the site covers the entrance to P&O Ferries berth which might suggest in part why the berth will be unavailable from the New Year. It also will mean the weighbridge for service which is located next the to existing level crossing will disappear and I suspect the perimeter road will be closed or heavily affected by the works. Traffic to and from the grain terminal will likely have to use the Strand Road gate during closures.
Boundary (sefton.gov.uk)
DC/2023/01392 | Certificate of lawfulness for the proposed improvements to existing rail links and access roads at Seaforth Dock | Seaforth Dock - Liverpool (sefton.gov.uk)
Interesting to note the site covers the entrance to P&O Ferries berth which might suggest in part why the berth will be unavailable from the New Year. It also will mean the weighbridge for service which is located next the to existing level crossing will disappear and I suspect the perimeter road will be closed or heavily affected by the works. Traffic to and from the grain terminal will likely have to use the Strand Road gate during closures.