Local newspapers reported this week that Teesside Airport would not receive a regular service again until 2024 at the earliest, after the three new platforms are due to come into service at Darlington. Which got me thinking; what sort of local service pattern should Teesside see in general from 2024?
The Darligton upgrade means through services to Bishop Auckland will now be split at Darlington. There's talk of extending from Saltburn to Loftus, although it seems unlikely that will be taken forward in my view. Middlesbrough should have it's new third platform by then, even if it's without the glitzy new north entrance that was planned. Also in the news recently, it has been confirmed that TPE will extend their Manchester service from Redcar to Saltburn. Reinstating platform two at Hartlepool was also in the pipeline.
My, hopefully not too fanciful, hope would be that Darlington-Saltburn increases to 3tph. If Teesside Airport's passenger numbers increase then adding that back as a regular call. Hopefully South Bank and Redcar BS stations will be well utilised in the redevelopment of the steelworks site/freeport.
With the extra capacity at Darlington, perhaps a regular Darlington-Hartlepool service could be introduced. It shouldn't impede TPE and LNER capacity to Middlesbrough much as there's only a short stretch of crossover at Eaglescliffe. This would surely help reduce congestion on the A19 Tees Viaduct, without needing to build a new road bridge.
Also reducing A19 congestion, will the the new through platform allow some Saltburn-Darlington services to continue to Newcastle? I guess it would have to be in conjunction with reinstating the Leamside line.
What are other people's thoughts?
The Darligton upgrade means through services to Bishop Auckland will now be split at Darlington. There's talk of extending from Saltburn to Loftus, although it seems unlikely that will be taken forward in my view. Middlesbrough should have it's new third platform by then, even if it's without the glitzy new north entrance that was planned. Also in the news recently, it has been confirmed that TPE will extend their Manchester service from Redcar to Saltburn. Reinstating platform two at Hartlepool was also in the pipeline.
My, hopefully not too fanciful, hope would be that Darlington-Saltburn increases to 3tph. If Teesside Airport's passenger numbers increase then adding that back as a regular call. Hopefully South Bank and Redcar BS stations will be well utilised in the redevelopment of the steelworks site/freeport.
With the extra capacity at Darlington, perhaps a regular Darlington-Hartlepool service could be introduced. It shouldn't impede TPE and LNER capacity to Middlesbrough much as there's only a short stretch of crossover at Eaglescliffe. This would surely help reduce congestion on the A19 Tees Viaduct, without needing to build a new road bridge.
Also reducing A19 congestion, will the the new through platform allow some Saltburn-Darlington services to continue to Newcastle? I guess it would have to be in conjunction with reinstating the Leamside line.
What are other people's thoughts?