Evening all,
Was just thinking about projected growth in East Anglia and Altnabreac's famous yardstick for reopenings.
1. Population of 10,000+
2. 60 minutes (75 at a push) journey time of a major employment centre.
3. Extant or mainly unobstructed trackbed
4. Ability to extend an existing service so more terminal capacity is not required.
I was thinking about MNR to Dereham then a new line to Swaffham before connecting up to the Lynn line at Middleton Towers.
Dereham to Norwich via Wymondham is a straightforward commercial deal with the MNR, and adds 19000 population to the line, with Norwich
0 mins away.
Swaffham to Dereham adds 7,000 in Swaffham and probably <15 mins, meaning comfortably <60 to Norwich, and <40 to Lynn.
Thoughts?
Was just thinking about projected growth in East Anglia and Altnabreac's famous yardstick for reopenings.
1. Population of 10,000+
2. 60 minutes (75 at a push) journey time of a major employment centre.
3. Extant or mainly unobstructed trackbed
4. Ability to extend an existing service so more terminal capacity is not required.
I was thinking about MNR to Dereham then a new line to Swaffham before connecting up to the Lynn line at Middleton Towers.
Dereham to Norwich via Wymondham is a straightforward commercial deal with the MNR, and adds 19000 population to the line, with Norwich

Swaffham to Dereham adds 7,000 in Swaffham and probably <15 mins, meaning comfortably <60 to Norwich, and <40 to Lynn.
Thoughts?