Bob Price
Member
- Joined
- 8 Aug 2019
- Messages
- 1,149
I thought they were looking to send it to the US for demos.
009 and 010 haven't been finished yet. I guess they will need approval once they are ready. 008 has done some local testing.I thought TFW had an order for 5 units but only 3 cleared for usage the article says !
Yes I know how they work, however they were activated today and then cancelled. I am sure there is a plan but would like to see them process.Paths are Q 'as required' for both local testing to Evesham and longer distance testing to Stourbridge Junction but are not currently being activated so presumably 008 is not being tested at the moment.
Yes I know how they work, however they were activated today and then cancelled. I am sure there is a plan but would like to see them process.
That would explain it. Often see the local ones activating.If nobody cancels them off they self activate 2 hours prior to starting time, Bob, so seems not required to run
Are 006, 007, 008 currently basing themselves at Birkenhead Depot whilst on testing?
Is this likely to change once they enter service?
There was talk of a dedicated Depot being built at Wrexham but all seems to have gone quiet now.. Using Birkenhead for maintenance and Chester Alstom Depot for fuel.
I think Birkenhead, which is a Mersey Rail EMU depot a little way off TfW territory is just temporary as there is talk of a new depot at Shotton. Are the Wrexham Bidston service not served from Chester? I don't think 008 is actually at Birkenhead yet, I think it is still at Long Marston being tested in Worcestershire.
The plan is for a dedicated vivarail staffed depot purpose built at Dee Marsh, it will only be for the 5 unit 230 fleets use.
Until then it will be Birkenhead North for maintenance and then Chester depot for fueling
Pretty sure Vivarail are Moving to Barry in South Wales from Long Marston as soon as the TFW order is done
Pretty sure Vivarail are Moving to Barry in South Wales from Long Marston as soon as the TFW order is done
They are already started building the 484's at LM so think the move may be on hold. Back to TfW is they have started the 484's then 009 and 010 must be well advanced.Pretty sure Vivarail are Moving to Barry in South Wales from Long Marston as soon as the TFW order is done
Plenty of training going on, just nothing to do with 230’s. What’s worse, the 2 230’s that have been on test have now officially been handed over apparently and there’s no one to drive them!! All test drivers are now on rhtt duties and not what. There’s many furloughed drivers, drivers that have had incidents, long term sick and all the newly qualified drivers to get through first, then all the trainees of which there are many! This is gonna be a long and slow process. I want to be involved with this project more than anyone but it’s just not gonna happen anytime soon.No training involvement with TFW staff as yet, TFW are trying to get safeguarded staff back asap & other staff returning to work plus instructors are being utilised getting delayed trainees out driving. So nobody is available to do any sort of training
It would be difficult - all 3 drivers links at Chester have work on the Bidstons so every driver needs to learn them (along with all the guards at both Chester and Shrewsbury). Swapping the jobs around a limited amount of crews who do sign them would be very difficult, especially as Chester are short of drivers and routinely having their jobs covered by other depots already.The first question I would ask would be who trains the trainers? Do all the crews in the depot have to be trained or can the service be started with a small pool of trained staff?
They’ve also just told us we all need to learn Piccadilly to the airport now too as network rail don’t want us taking up the mayfield loop. So that’s all red link and the starter link drivers tied up for a while.
It would be difficult - all 3 drivers links at Chester have work on the Bidstons so every driver needs to learn them (along with all the guards at both Chester and Shrewsbury). Swapping the jobs around a limited amount of crews who do sign them would be very difficult, especially as Chester are short of drivers and routinely having their jobs covered by other depots already.
They’ve also just told us we all need to learn Piccadilly to the airport now too as network rail don’t want us taking up the mayfield loop. So that’s all red link and the starter link drivers tied up for a while.