• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by The Planner

  1. T

    Cross Country cutting out Winchester and Basingstoke stops

    Still would take the same time as you trundle along to keep the timetable.
  2. T

    What is the point of Old Oak Common?

    Right, so it not really OOC to Brighton then.
  3. T

    WCML Power Supply & Auto Transformer Upgrade

    Power supply is computer modelled by the principal route engineer (PRE)
  4. T

    What is the point of Old Oak Common?

    How would you do that? There is no connection to the WLL
  5. T

    Why are XC allowed to continue?

    Struggled enough to get Bromsgrove Westerleigh to what it is now. Level crossings still causing the problems.
  6. T

    WCML Power Supply & Auto Transformer Upgrade

    807s are more power hungry, also factor in that NR are now probably at a point where they don't want to get perilously close to the limits.
  7. T

    HS2 Construction Updates - Birmingham Area

    Thats a permanent solution, it looks like the viaducts sit on the existing road.
  8. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    Its 100 HST from Bicester to Bletchley, id be amazed if that got dropped at this point when its effectively built. There is very little saving in it.
  9. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    That has the potential to bork the timetable then as you could only run 168s and a 196 will be quicker off the blocks.
  10. T

    How could the Elizabeth line expand?

    Its the other way around, TfL wouldn't want it themselves. They didnt want to pay for the proposed extension to Tring, which would have knackered the slow lines on the WCML.
  11. T

    GWR planning Saturday Bristol - Oxford service Sept to Dec 2024

    I will be. They certainly aren't running past Oxford in the short term.
  12. T

    Is the Heathrow Express a viable, worthwhile service?

    3 minute headways all over the place on the network. Its as low as 2 between Paddington and Reading in specific circumstances.
  13. T

    How could the Elizabeth line expand?

    How are you getting them to Paddington? There isn't any room on the reliefs.
  14. T

    Is the Heathrow Express a viable, worthwhile service?

    Bear in mind that declaring congested infrastructure, that NR needs a plan to resolve it. Whether thats tinkering at the edges, a timetable change or reduction or new infrastructure. Normally its not a cheap process. You don't just declare it and say oh well.
  15. T

    East Coast Timetable Dec 24

    I dont believe that is happening in my opinion, the PMO only appears to worry about whether a timetable can be delivered by system operator.

Top