• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Potential future uses for class 68 & Mk5 sets?

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
5,737
Location
Croydon
Actually, one idea that was gaining ground within DfT was to use them on the Nottingham-Cardiff service. It's not just about that service, but also frees up 170s for use elsewhere.

If you think a total fleet of 13 trains can replace 16 in traffic trains, sure. And would like to pay for two lots of trains at the same time.
It gets difficult when considering fleet size as less likely to get a match for most ideas/opportunities. Yes, in the case of Scot Rail it would leave them with some HSTs unless they took on something else - hopefully not a microfleet but ideally something they already use (where from). Yes, generally, need to bear in mind how long existing leases have to go (I hadn't !).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Iskra

Established Member
Joined
11 Jun 2014
Messages
7,997
Location
West Riding
It gets difficult when considering fleet size as less likely to get a match for most ideas/opportunities. Yes, in the case of Scot Rail it would leave them with some HSTs unless they took on something else - hopefully not a microfleet but ideally something they already use (where from). Yes, generally, need to bear in mind how long existing leases have to go (I hadn't !).
222's are strongly rumoured for Scotrail. Maybe any spares could go to Open Access. They should be freed up in the next couple of years by 810's.
 

E27007

Member
Joined
25 May 2018
Messages
682
The Transport for Wales Class 67 + ex-ECML Mark 4 stock are under-utilised, the Class 67 four diagrams per day are frequently 50% or 75% 150/197 dmu units, Are the ex-ECML Mark 4 stock compatible with the loading gauge for the Chiltern route?
 

quailking14

Member
Joined
30 Dec 2023
Messages
22
Location
West Mildands
Are the ex-ECML Mark 4 stock compatible with the loading gauge for the Chiltern route?
Yes
Its the loco bit that seems to be the problem - the 68s are too noisy. Lots of discussion up thread about it but otherwise it seems the favorite.
The new tri-mode class 93 could be an option if its diesel mode is quiet enough. It is shocking that the class 68s, a modern diesel loco built in 2014 has to be too loud. Maybe the cheapest solution is to make quieter engines for the 68s
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
5,737
Location
Croydon
The Transport for Wales Class 67 + ex-ECML Mark 4 stock are under-utilised, the Class 67 four diagrams per day are frequently 50% or 75% 150/197 dmu units, Are the ex-ECML Mark 4 stock compatible with the loading gauge for the Chiltern route?
I guess you are suggesting the TfW 67s+Mk4s go to Chiltern enabled by TfW taking on the 68s+Mk5s. I think the Mk4s are underutilised because they are unreliable so not attractive. TfW own the Mk4s so they could not just stop using them without finding a justification. The Chiltern option comes in because Chiltern are looking for more trains then just replacing their Mk3s so I feel the Mk4s will not be enough.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
5,737
Location
Croydon
Yes

The new tri-mode class 93 could be an option if its diesel mode is quiet enough. It is shocking that the class 68s, a modern diesel loco built in 2014 has to be too loud. Maybe the cheapest solution is to make quieter engines for the 68s
You will need to read back, it has been done to death. Bi-modes are nowhere near powerful enough on a 100% diesel route. Some say 68s might get modified silencers. It is not the diesel engine that is noisy it is how well the silencer works. So no need to change the engine unless a smaller engine allows more space for a bigger (better) silencer.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
7,997
Location
West Riding
I guess you are suggesting the TfW 67s+Mk4s go to Chiltern enabled by TfW taking on the 68s+Mk5s. I think the Mk4s are underutilised because they are unreliable so not attractive. TfW own the Mk4s so they could not just stop using them without finding a justification. The Chiltern option comes in because Chiltern are looking for more trains then just replacing their Mk3s so I feel the Mk4s will not be enough.
Putting unreliable locomotive sets onto a two-track London commuter route, would be madness. And that’s before you think about all the time and money spent on (re)-training staff.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
3,299
Location
The back of beyond
Yes

The new tri-mode class 93 could be an option if its diesel mode is quiet enough. It is shocking that the class 68s, a modern diesel loco built in 2014 has to be too loud. Maybe the cheapest solution is to make quieter engines for the 68s

Feel free to scroll through the previous few pages where this issue has been discussed to death. Suffice to say the 68s will not be fitted with 'quieter engines' and 93s will not be used.
 

Philip

On Moderation
Joined
27 May 2007
Messages
3,648
Location
Manchester
Could class 57s be used to haul mk5 coaches (with necessary adaptations), if the class 68 noise modifications aren't effective? The overhauls they had were around the same time as the 67s being built, so effectively it's a loco of a similar age, but known to be reliable. They held their own hauling Pendolinos on long distance runs.
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
Posts like this remind me why staff often get frustrated with this forum. I'm not sure what you're getting upset about but you were pretty politely told why it's not necessarily more likely for them to go on the 170 routes and not the Voyager routes at XC.

Given how much padding is in the timetables of the Voyager routes, and how apart from along the Birmingham - Edinburgh corridor there isn't all that much running above 100mph, they might not actually cope too badly with the timings.
Not upset in the slightest, though point scoring does get a bit tedious.

You make an interesting point about the Voyager routes, I’ll be honest and admit that I had only really thought about the Edinburgh-Birmingham route and assumed that there would be a lot of inter working between that axis and the Manchester route.

Perhaps the Class 68/Mk5A sets would likely be able to keep the schedules on the Manchester-Bristol and Manchester-Bournemouth routes.

I still think that Chiltern is odds on favourite though, for many of the reasons mentioned by other posters, plus with them being a small and fairly specialised fleet, keeping them confined to a limited number of depots/stabling points would have advantages.

Its a speculative thread so your entitled to throw any ideas you have into the ring. Otherwise there would be no potential uses discussed. Of course then have to be brave and see what the feedback is.
Yes, agreed, though I think XC is spectacularly unlikely on any of their routes.
 

Aquamanda

Member
Joined
6 Sep 2023
Messages
13
Location
Somewhere
You will need to read back, it has been done to death. Bi-modes are nowhere near powerful enough on a 100% diesel route. Some say 68s might get modified silencers. It is not the diesel engine that is noisy it is how well the silencer works. So no need to change the engine unless a smaller engine allows more space for a bigger (better) silencer.
Someone somewhere on here a while ago said that it's not just the 68s' inadequate silencers that are the cause of the noise issue, but that it's also due to the engine mounts or something like that, transferring too much vibration to the body, which "amplifies" the noise.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
5,737
Location
Croydon
Someone somewhere on here a while ago said that it's not just the 68s' inadequate silencers that are the cause of the noise issue, but that it's also due to the engine mounts or something like that, transferring too much vibration to the body, which "amplifies" the noise.
I suppose the body or at least the engine compartment could be acting as a huge sound box.
 

jagardner1984

Member
Joined
11 May 2008
Messages
678
As a genuine don’t know question - have there ever been any instances where diesel stock such as the 68 had some form of electrical connection to be fitted (ideally automatic, such as some locating connection which connects / disconnects at zero speed under the loco - with the purpose of providing shore supply for the train services in platform, allowing the engines to run up and take over in the moments before departure ?

Ignoring the noise for a moment, it seems strange that this hasn’t been pursued (doubtless in some simpler and more obvious way than I have pondered above) from an environmental perspective aside from anything else, particularly in the diesel heavy terminus train sheds.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
3,299
Location
The back of beyond
As a genuine don’t know question - have there ever been any instances where diesel stock such as the 68 had some form of electrical connection to be fitted (ideally automatic, such as some locating connection which connects / disconnects at zero speed under the loco - with the purpose of providing shore supply for the train services in platform, allowing the engines to run up and take over in the moments before departure ?

Ignoring the noise for a moment, it seems strange that this hasn’t been pursued (doubtless in some simpler and more obvious way than I have pondered above) from an environmental perspective aside from anything else, particularly in the diesel heavy terminus train sheds.

I'm not sure how this would work. It's certainly simpler to have the coaching stock connected to a shore supply to maintain hotel power during stabling than designing a system that allows the loco to do so whilst shut down. A 'shore supply' is exactly that - a connection from the loco to the stock would be something else.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
14,859
Location
Epsom
Spotted a set in Wolverton Works this morning, it's clearly visible from the main road. Is it having something done or just in storage?
I believe that is TP01 for crack repairs, unless they've swapped the sets round in the past 3 months.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
16,030
Could class 57s be used to haul mk5 coaches (with necessary adaptations), if the class 68 noise modifications aren't effective? The overhauls they had were around the same time as the 67s being built, so effectively it's a loco of a similar age, but known to be reliable. They held their own hauling Pendolinos on long distance runs.
They would have to be 57/3 or 57/6 as they can do 95mph. Even then unless they can match a 68 at acceleration then it could still break the paths.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,093
Yes and no. XC like to get between A and B as rapidly as possible with longer dwells at the bigger stations to soak up any delays. They don't like being given paths where they get pathed out (not that they have much choice on lines such as the cross city south)
Interesting. I know it's probably too broad a question, but in general would XC's paths work if they were slowed down and the dwell times reduced to compensate, or do they actually require the 125mph dash between stations?
Could class 57s be used to haul mk5 coaches (with necessary adaptations), if the class 68 noise modifications aren't effective? The overhauls they had were around the same time as the 67s being built, so effectively it's a loco of a similar age, but known to be reliable. They held their own hauling Pendolinos on long distance runs.
My own memories from being at VT in the early 2010s is that they weren't terribly reliable - and I don't think GWR are having a great time with theirs either, despite their limited workload.
You make an interesting point about the Voyager routes, I’ll be honest and admit that I had only really thought about the Edinburgh-Birmingham route and assumed that there would be a lot of inter working between that axis and the Manchester route.

Perhaps the Class 68/Mk5A sets would likely be able to keep the schedules on the Manchester-Bristol and Manchester-Bournemouth routes.
In the pre COVID times with an all day half hourly Manchester service, the Bristol and Bournemouth services used to interwork at Manchester. I'm not sure how much they do now though, or indeed on other routes
I still think that Chiltern is odds on favourite though, for many of the reasons mentioned by other posters, plus with them being a small and fairly specialised fleet, keeping them confined to a limited number of depots/stabling points would have advantages.
Indeed, from day one they seemed the obvious candidate.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
16,030
Interesting. I know it's probably too broad a question, but in general would XC's paths work if they were slowed down and the dwell times reduced to compensate, or do they actually require the 125mph dash between stations?
Your big dwells tend to be at Reading (reversal), New St , Bristol, Derby and York. You can't go below 90 seconds on the dwells outside the bigger stations and the bigger stations will require 2 or 3 minutes minimum as well. There isn't that much fat to trim.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,306
Location
Between Edinburgh and Exeter
Could class 57s be used to haul mk5 coaches (with necessary adaptations), if the class 68 noise modifications aren't effective? The overhauls they had were around the same time as the 67s being built, so effectively it's a loco of a similar age, but known to be reliable. They held their own hauling Pendolinos on long distance runs.

They would have to be 57/3 or 57/6 as they can do 95mph. Even then unless they can match a 68 at acceleration then it could still break the paths.

However the elephant in the room is a simple one. AAR connectors. Something the 57 doesn't have, so cannot multi-work with the MK5 sets. The other advantage to the 68 / TPE Mk5 idea is that the cab in the Driving Trailer (whatever it's called) has a deliberately designed layout to that of the 68, so you'd end up spending even more time on training than you would if you simply retained the whole set.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,782
However the elephant in the room is a simple one. AAR connectors. Something the 57 doesn't have, so cannot multi-work with the MK5 sets. The other advantage to the 68 / TPE Mk5 idea is that the cab in the Driving Trailer (whatever it's called) has a deliberately designed layout to that of the 68, so you'd end up spending even more time on training than you would if you simply retained the whole set.
My understanding is TPE assigned 68s do not use AAR connectors for multiple unit control.

I think only Chiltern assigned locomotives have been so fitted.
 

dgl

Established Member
Joined
5 Oct 2014
Messages
2,415
As a genuine don’t know question - have there ever been any instances where diesel stock such as the 68 had some form of electrical connection to be fitted (ideally automatic, such as some locating connection which connects / disconnects at zero speed under the loco - with the purpose of providing shore supply for the train services in platform, allowing the engines to run up and take over in the moments before departure ?

Ignoring the noise for a moment, it seems strange that this hasn’t been pursued (doubtless in some simpler and more obvious way than I have pondered above) from an environmental perspective aside from anything else, particularly in the diesel heavy terminus train sheds.
I suppose either a 3rd rail or overhead wire could do it. I believe some stations in the past have had shore supplies for the HST so it is possible, whether or not it's cost effective is another thing, plus it's one more thing to worry about/go wrong.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,355
However the elephant in the room is a simple one. AAR connectors. Something the 57 doesn't have, so cannot multi-work with the MK5 sets. The other advantage to the 68 / TPE Mk5 idea is that the cab in the Driving Trailer (whatever it's called) has a deliberately designed layout to that of the 68, so you'd end up spending even more time on training than you would if you simply retained the whole set.
The Mark 5s don't use AAR. It's WTB using UIC cables, with an additional CAF/Mk 5 -specific jumper as well.
 

Bryson

Member
Joined
24 Jan 2022
Messages
89
Location
Yorkshire
I suppose either a 3rd rail or overhead wire could do it. I believe some stations in the past have had shore supplies for the HST so it is possible, whether or not it's cost effective is another thing, plus it's one more thing to worry about/go wrong.
As a genuine don’t know question - have there ever been any instances where diesel stock such as the 68 had some form of electrical connection to be fitted (ideally automatic, such as some locating connection which connects / disconnects at zero speed under the loco - with the purpose of providing shore supply for the train services in platform, allowing the engines to run up and take over in the moments before departure ?

Ignoring the noise for a moment, it seems strange that this hasn’t been pursued (doubtless in some simpler and more obvious way than I have pondered above) from an environmental perspective aside from anything else, particularly in the diesel heavy terminus train sheds.
The HST's used to be connected to a shore supply at the London Terminals. The cover plate on the nose of the power car swung up to reveal the coupling and also the power socket. On arrival the cover was opened and a cable run from a supply mounted behind the buffers.

1707327902525.png
Not my Photo.
 

The Chimaera

Member
Joined
15 Jun 2018
Messages
55
Could class 57s be used to haul mk5 coaches (with necessary adaptations), if the class 68 noise modifications aren't effective? The overhauls they had were around the same time as the 67s being built, so effectively it's a loco of a similar age, but known to be reliable. They held their own hauling Pendolinos on long distance runs.
You aren’t taking into account that the small 16 loco fleet is now split between at least 3 freight/charter operators who are busy using them for their own purposes.
 

Top