Evening folks.
A friend asked me this actually.
He was wondering why the former Southern region didn't use concrete sleepers when Exmouth Junction concrete works were turning out so many other prefabricated things such as footbridges, lamp posts, fencing etc?
I thought that it was possibly because concrete sleepers started being used when continuous welded rail started to become the norm and that the sleepers used were of a far higher quality concrete than could be produced at the EJCW? Although I'm really not sure hence asking here.
Any advice gratefully received.
A friend asked me this actually.
He was wondering why the former Southern region didn't use concrete sleepers when Exmouth Junction concrete works were turning out so many other prefabricated things such as footbridges, lamp posts, fencing etc?
I thought that it was possibly because concrete sleepers started being used when continuous welded rail started to become the norm and that the sleepers used were of a far higher quality concrete than could be produced at the EJCW? Although I'm really not sure hence asking here.
Any advice gratefully received.