From the webcam trains are running to the pier head again but from https://www.realtimetrains.co.uk/ only hourly. The walkway on what was the tramway pier looks to be open too. There still looks to be a compound so the station building may not be complete. The undercover waiting / seating area for buses is barricaded off so just the new small shelters for cover.
No doubt the car ferries are all running full to capacity but a big change from 1967 when on a summer Saturday 42 out of the 43 VEC-TIS cars were scheduled to run.
No doubt the car ferries are all running full to capacity but a big change from 1967 when on a summer Saturday 42 out of the 43 VEC-TIS cars were scheduled to run.