It is more than a year now since the pedestrian level crossing near Billericay station was replaced by a footbridge, but the 30mph speed restriction is still in force, and religiously complied with by drivers slowing down on approach, and not seeding up on departure to/from the station.
How long does it take Network Rail to catch up with such a change to the infrastructure and update the speed restrictions? I notice that London bound is 80mph beyond the 30, and Southend bound is 70mph.