there's more to this than meets the eye. Someone posted upthread that one of the Railway magazines has shared details of the proposed configuration of the 5 cars and there's only 2 motored vehicles. This would have an effect on performance on electric, perhaps limiting them to 125mph (the 800/801/802s are 140mph on electric once ERTMS is rolled out). It was also announced that Hitachi have devised a way to deploy 4 diesel power packs. This would mean one diesel power pack per bogie, which means there's sufficient power to run the traction motors flat out on diesel, meaning no difference in performance on diesel vs electric. But with a top speed of 125mph. This looks interesting.