Right......
Additional Infrastructure:
Victoria - Chat Moss flow to be grade separated by a flyover over the current junction at Ordstall Lane, passing onto the Ordstall Ln - Deal St viaduct, now 4 track on the SE side, with the Castlefeild curve going on the NW side, under the viaduct, so that the Castlefeild Curve and services toward Salford Crescent don't interfere with services on the Chat Moss, that could be many tph.
Victoria termination facilities:
Additional bay platforms at Rochdale, Stalybridge and Ashburys, all electrified to Victoria.
Oxford Road re-building:
Re-build Oxford Road, cutting off Platform 5, and extending Platforms 4 and 1 to 8x23m long, there is space for this on the current viaduct if platforms 2 and 3 are cut to 4*23m and tracks slew inwards, with double scissor approaches on both sides. Trains would be able to enter and exit platforms independently so one may enter as the other leaves etc.
Platforms 5 and 6 (and possibly 7) would be served by a new extension of the Metrolink lines from Deansgate G-Mex over on a new semi-open, 2 viaduct over the street, and footpath on one side, with the footpath exclusively running under the viaduct after crossing the traffic lights at the top of the A5103. 2 or 3 100m long platforms for trams and tram/trains.
Metrolink Expansion:
Cornbrook would gain some tracks and platforms, the line between Cornbrook and Deansgate would be 4 track, with 2 leading across the city and the other two leading to the rebuilt oxford road. This would allow up to 60, 70 or 80 tph over the route, and with the terminating bays at Oxford Road, it would re-dress the balance of the lop sided network. It would also gain platforms on the CLC route.
Lines would be put in place to:
E. Didsbury extended to Stockport
Airport Line Loop completed
Salford Reds (Trafford Park) Line completed
And not previously proposed:
Salford Reds Line extended through Walkden to Bolton
Bolton - Bury - Rochdale (On to Rochdale using Tram/Train units)
Ashton Under Lyne - Oldham
And some strange ones that would maybe be politically unpopular
Manchester - Navigation Road - Lymm - Warrington Central (Tram/Train)
Also, the 'shared bits of track' would become actually shared between network rail trains and metrolink trains, with both platforms for both service types, the same at Alt'ham.
The general use of platforms would then be...
Platform 1: Westbound and Victoria Bound through services
Platform 2: Westbound, Victoria bound through services, and terminating services from either direction.
Platform 3: Eastbound, Piccadilly bound through services, and terminating services from either direction.
Platform 4: Eastbound and Piccadilly bound through services.
Additional Piccadilly Platforms:
Fairfeild St, either two additional platforms with 2 or 3 central roads in the slow lines toward Longsight as use for a headshunt for terminating services from Oxford Road, to share the termination of services. Or, 4 additional platforms, the two central of the new platforms used for terminating services.
Piccadilly East: Additional platforms on the East of Piccadilly for more services from the East Lines
6 track, 6 track between Piccadilly and Slade Lane Junction.
Service Patterns:
CLC:
TPE:
1tph Liverpool L St - Victoria - (Leeds) DMU
1tph Chester - Victoria - (Leeds) DMU
NT:
2tph Victoria - Liverpool L St All stations EMU
2tph Victoria - Wigan NW All stations (Additional station at Culceath) EMU
4tph Liverpool L St - Wigan, 2tph via each route. EMU
1tph Victoria - Warrington Central EMU (Opersite 0.5hr to the TPE service)
1tph Manchester Airport - Liverpool L St Limited Stop
1tph Victoria - Liverpool L St Limited Stop (Running in the operside 0.5hr to the TPE Service)
ICWC:
1tph Manchester Airport - Scotland
ATW:
1tph Manchester Piccadilly (Airport) - Llandudno / Holyhead.
CLC:
EMT:
1tph Liverpool L St - Norwich (As is)
NT:
1tph Liverpool L St - Buxton Limited Stop DMU (Liverpool L St - Liverpool S Parkway - Hunts Cross - Warrington Central - Birchwood - Cornbook - Deansgate - MCO - Piccadilly - Stockport - Hazel Grove - All Stations Buxton)
2tph All stations Manchester Piccadilly / Oxford Road - Liverpool Lime Street
And for the Mid Cheshire Line etc. (As I have hinted at), that would be tram-train operated from Platforms 5, 6, 7.
3tph Manchester Oxford Road - Chester via Altham (With passing loops possibly added later, a part 4 tracked metrolink network), keeping 1tph to Stockport.
2tph Manchester Oxford Road - Crewe via Altham and Middlewitch.
And maybe
2tph Manchester Oxford Road - Warrington Central via Lymm
And the rest of Metrolink:
3 - 5tph Bolton - Rochdale via Bury Interchange
3 - 5tph Bolton - Trafford Centre - Manchester OR
3 - 5tph Ashton U Lyne - Oldham
Anyway, I've ranted on enough now I think, time to get told I'm wrong as usual
--- old post above --- --- new post below ---
Oh and as a PS: I'd also proberbly join in the Trafford Park line onto the Alt'ham line, and possibly even further on to the Airport Line, so that a service could potentially run, Bolton - Airport via Walkden, Salford Reds, Trafford Centre, Sale and Wythenshawe...