comparison of class 802/2 introduction on TPE Vs GWR

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tpjm

Member
Joined
25 Jan 2019
Messages
484
Location
The North
World's apart from GWR's rapid introduction of their 36 802s.... First one into passenger traffic August 2018. Last one by April this year I believe. 8 months then and 14 of them are 9 car too so more carriages in total.
The slower introduction is because of a lack of ability to free up train crew for traction training. GWR weren’t training three new fleets at the same time. You mustn’t forget that delivery of the TPE fleets was supposed to be consecutive instead of parallel.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
2,928
World's apart from GWR's rapid introduction of their 36 802s.... First one into passenger traffic August 2018. Last one by April this year I believe. 8 months then and 14 of them are 9 car too so more carriages in total.

I don't think the TPE ones have given anyone any air-con showers yet though......
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,231
World's apart from GWR's rapid introduction of their 36 802s.... First one into passenger traffic August 2018. Last one by April this year I believe. 8 months then and 14 of them are 9 car too so more carriages in total.

The slower introduction is because of a lack of ability to free up train crew for traction training. GWR weren’t training three new fleets at the same time. You mustn’t forget that delivery of the TPE fleets was supposed to be consecutive instead of parallel.

GWR and Hitachi had already brought lots of similar Class 800s into service by the time they got on to the 802s, so it was hardly surprising the latter were introduced at a rate of knots.

The introduction of the GWR 800s in 2017-18 was hardly a cakewalk, with months of training time lost in the middle of 2017 because electrical interference issues meant they could not get access to the Reading-Didcot section for familiarisation running. Some GWR drivers were learning other traction as well as IETs, due to developments like the build-up of the new Worcester depot around the same time.

Late 2017 and the first half of 2018 in much of GWR-land were a painful experience all round but reliability and punctuality has been transformed since then.
 

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,660
World's apart from GWR's rapid introduction of their 36 802s.... First one into passenger traffic August 2018. Last one by April this year I believe. 8 months then and 14 of them are 9 car too so more carriages in total.
As others have noted, training on the units is a big issue. If you’d prefer the appalling level of HSS cancellations that GWR experienced for many months whilst it was transitioning from the HSTs to IETs then I’m sure TPE could arrange it.
 

DannyMich2018

Member
Joined
19 Dec 2018
Messages
736
As others have noted, training on the units is a big issue. If you’d prefer the appalling level of HSS cancellations that GWR experienced for many months whilst it was transitioning from the HSTs to IETs then I’m sure TPE could arrange it.
Yes but according the other TPE threads there has been many cancellations already, often a passenger service cancelled for a training path. Plus GWR were coping with a network been electrified at the same time. Of course it's the passengers suffering for longer as they have to endure crowded 185's for longer.
 

LittleAH

Member
Joined
24 Oct 2018
Messages
176
Yes but according the other TPE threads there has been many cancellations already, often a passenger service cancelled for a training path. Plus GWR were coping with a network been electrified at the same time. Of course it's the passengers suffering for longer as they have to endure crowded 185's for longer.

Only a handful were cancelled for a training path and this was signed off by the Rail North Partnership apparently. Every TOC seems to go through this, those who travel around the country see what it does. LNER did it, GWR did it. No different for TPE.
 

tpjm

Member
Joined
25 Jan 2019
Messages
484
Location
The North
Cancellations were few and were limited to Class 802 and the level of congestion on the route.

Class 397 is training in the class 5 LIV - GLC paths and initial MkVa was off route with the rest 'in service'.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
8,692
Yes but according the other TPE threads there has been many cancellations already, often a passenger service cancelled for a training path. Plus GWR were coping with a network been electrified at the same time. Of course it's the passengers suffering for longer as they have to endure crowded 185's for longer.

They'd have to endure the 185s for even longer if they didn't cancel some paths for training.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
7,455
Location
UK
Yes but according the other TPE threads there has been many cancellations already, often a passenger service cancelled for a training path. Plus GWR were coping with a network been electrified at the same time. Of course it's the passengers suffering for longer as they have to endure crowded 185's for longer.

Well GWR passengers were suffering with overcrowded HSTs and Turbos, Sprinters etc as well.
 