I am getting confused about various rolling stock orders and their status
Attached as pdf as I could not get a table to work
Please post corrections

Thanks
 

Attachments

  • rolling.pdf
    19.8 KB · Views: 163
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gage75

Member
Joined
8 Aug 2009
Messages
306
Afaik the 377 are Southern stock on loan to TL until the new TL stock is delivered with the 377s returning to Southern for possible use to GatEx,
The 385 are actually cls387
 

thetangoman

Member
Joined
26 Feb 2013
Messages
113
Location
Helensburgh
Scotrail. Glasgow/Edinburgh Improvement Program

I don't think there has been any mention of what type of EMU but I could be wrong
 

physics34

Established Member
Joined
1 Dec 2013
Messages
3,903
Afaik the 377 are Southern stock on loan to TL until the new TL stock is delivered with the 377s returning to Southern for possible use to GatEx,
The 385 are actually cls387

The 377s currently with Thameslink will be going to Great Northern to replace most 365s.

Gatwick Express is likely to get a 387 variant but it has yet to be formally announced.
 

petersi

Member
Joined
24 Apr 2012
Messages
453
Scotrail. Glasgow/Edinburgh Improvement Program

I don't think there has been any mention of what type of EMU but I could be wrong

until the new franchise is agreed details of number and configuration is unknown. So I have chosen to leave them off.

There are a number of projects where the rolling stock to be used seams uncertain midland main line, Trans Pennine electrification are two such projects.

In the class 387 thread there could be another order for these units.

From the PDF it looks as though if all the orders listed happen then 25% of the carriages on our railway will be ordered in CP5.
(based on that currently there are approximately 1300 carriages in use)
Ps
If any one wants to play with the figures I am happy to supply it as a CVS
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
32,798
Afaik the 377 are Southern stock on loan to TL until the new TL stock is delivered with the 377s returning to Southern for possible use to GatEx,
The 385 are actually cls387

Not directly. Those 377s in the OP's list (40 vehicles) are the later order of 5 car dual voltage units, 377/7s and they are used on Southern routes, but not Thameslink.

They were ordered to allow some existing four car dual voltage 377/2s to be loaned to Thameslink.
 

G_A_C_C_C

Member
Joined
11 Dec 2008
Messages
118
Location
High Wycombe
the 707s (SWT) order is for 30 x 5 car trains (not 4 car).

There are rumours that the TFL order has 6 additional 4 car units
 

CardiffKid

On Moderation
Joined
13 Feb 2011
Messages
1,079
Location
Cardiff
Are the 800s currently being built?

I didn't realise that the final specifications (carriage numbers etc) had been confirmed for the GWML.
 

petersi

Member
Joined
24 Apr 2012
Messages
453
I have forgotten the new c2c franchise commitment for 17 new trains are these 4 carriage ?

--- old post above --- --- new post below ---
Are the 800s currently being built?

I didn't realise that the final specifications (carriage numbers etc) had been confirmed for the GWML.

I chose to mark them being built as a prototype has been built that should be in the uk next year for testing.
See here
 
Last edited:

petersi

Member
Joined
24 Apr 2012
Messages
453
Updated the PDF

Added class 387 additional carriages
Added Caledonian sleeper but need more more details to complete entry
Added C2C order asumed 4 carriage train please confirm
Corrected south west order.
 

Attachments

  • rolling.pdf
    20.1 KB · Views: 33

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,773
I've had a fiddle! The total cars for each order is now calculated from units x cars per set, the total number of carriages is a total of that column
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,280
Might be worthwhile to add a column for options (if anybody is sufficiently up-to-speed), as that might add a bit of factual background to some discussions that go on here. Is it just Crossrail and Southern 387s with options at present?

Having said that, I do realise that adding a bit of leeway for future growth and changes of plan is, on the whole, not the way we do things in this country.
 

petersi

Member
Joined
24 Apr 2012
Messages
453
Might be worthwhile to add a column for options (if anybody is sufficiently up-to-speed), as that might add a bit of factual background to some discussions that go on here. Is it just Crossrail and Southern 387s with options at present?

Having said that, I do realise that adding a bit of leeway for future growth and changes of plan is, on the whole, not the way we do things in this country.
Be good to but its not always easy to work out contract options
 

petersi

Member
Joined
24 Apr 2012
Messages
453
Update the spread sheet with the new Scottish franchise even though details are sketchy.

Interestingly a lot more trains ordered in cp5 than some rolling stock analyst suggested even as late as feb 2014
see http://www.raildeliverygroup.com/

A lot of resources are going to be needed to commission all these trains
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
New details broke, prefered bidder is Hitachi with an order of 70 AT200 trains totalling 234 carriages to be built at Newton Aycliffe, will operate Edinburgh-Glasgow and Stirling/Alloa/Dunblane services.
 