Such a shambles. It would be great if they opened up the other half side of the bridge to put more shelter and retail units.
Seeing as the station is going to undergo a major reconstruction (8 platforms from 6) from 2024 as part of the CARS program I doubt much will be done at all. It will likely have to be torn down and rebuilt then.
Indeed which is why mavsk postedI don't think there's quite enough room for a whole new island and two more tracks west of the Platform 1 track, so I think the plan would be to move the Platform 2 track into the space between 2 and 3, and rebuild the P1/2 island a bit further east.
Correct - there's passive provision in the design for a new lift shaft for the new platform and to move the lift shaft and stairs to platform 1/2.