Failed Unit
Established Member
We have a couple of threads about faster services to Leeds / Edinburgh from London.
But as the original timetable covered all operators, I was just wondering if we had an consulations about the rest of them. For example EMR was planning to remodel a lots of their routes to included.
Grimsby - Leicester hourly
Peterborough - Doncaster hourly (and more clockface)
Norwich - Liverpool (all bets off but splitting as a result of path changes on the ECML)
Then of course Northern and XC would need to make adjustment.
From the EMR neck of the woods I really hope to see the following:
Clockface departures
Good connections at Doncaster from Lincoln.
Good connections at Lincoln to / from Grimsby. (At the moment they are unuasable as the LNER service leaves 5 minutes before the EMR service arrives at Lincoln)
But as the original timetable covered all operators, I was just wondering if we had an consulations about the rest of them. For example EMR was planning to remodel a lots of their routes to included.
Grimsby - Leicester hourly
Peterborough - Doncaster hourly (and more clockface)
Norwich - Liverpool (all bets off but splitting as a result of path changes on the ECML)
Then of course Northern and XC would need to make adjustment.
From the EMR neck of the woods I really hope to see the following:
Clockface departures
Good connections at Doncaster from Lincoln.
Good connections at Lincoln to / from Grimsby. (At the moment they are unuasable as the LNER service leaves 5 minutes before the EMR service arrives at Lincoln)