A bus every fifteen minutes as per the timetable. If there is a problem on the route all day some effort to adjust the workings. The bus I joined in Camborne changed driver perhaps a bus out of the garage to slot in so that driver started on time and use the bus pulled off to slot in later. Passengers on the pulled bus could easily change into the bus that was running with it.
Just a little effort needed.
Two separate routes that join together for the last half both on 30 minutes. Roadworks delaying one half. Both need to run on for through customers.
To place the missing journeys would require 4 buses and 10 drivers across the week. Maybe you aren’t aware but we have a driver shortage caused by growing numbers of staff isolating and a delay through Occ Health and DVSA in getting the 40 trainees we have waiting to start out.
‘just a little effort needed’ - our whole team who aren’t off with Covid is busting backsides week in week out, day in day out, hour in hour out - to keep the show on the road against huge odds at present.