Gloucester resignalling design contract awarded

Status
Not open for further replies.

stuu

Established Member
Joined
2 Sep 2011
Messages
2,772
Are both the middle roads through Glos station still in use? One looks very overgrown, with an iffy-looking track.
A container train used one of the tracks when I was there at the beginning of June, fairly sure it was the northerly one
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,715
Location
Mold, Clwyd
It was a mechanical signalbox, so the location would have appeared in a renewal programme at some point. Maybe they brought it forward a little to align with electrification and track renewals. The financial wizards had some mechanism for accessing at least a proportion of the renewals budget even for a non-fully depreciated asset replaced early.
The CP5 Manchester-Blackpool upgrade/electrification cost more per track km than the much-publicised GW scheme.
It's difficult to know how much the Kirkham scheme cost in relation to the rest (eg the redesign of the Bolton area foundations, or the Blackpool remodelling).
The scheme began with the fatuous notion of 125mph line speeds, but ended with no material change from 70/75mph (although through trains are not checked to 30mph through Kirkham now).
But the new Kirkham layout and new platform seems to be a very efficient layout.
The line, including the Blackpool South branch, is now managed from Manchester ROC.
Something like 5 manual signal boxes were eliminated.
If the Fleetwood branch comes back, there will have to be some changes at Poulton, where the former branch junction was eliminated.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
2,907
Location
Lancashire
The CP5 Manchester-Blackpool upgrade/electrification cost more per track km than the much-publicised GW scheme.
It's difficult to know how much the Kirkham scheme cost in relation to the rest (eg the redesign of the Bolton area foundations, or the Blackpool remodelling).
The scheme began with the fatuous notion of 125mph line speeds, but ended with no material change from 70/75mph (although through trains are not checked to 30mph through Kirkham now).
But the new Kirkham layout and new platform seems to be a very efficient layout.
The line, including the Blackpool South branch, is now managed from Manchester ROC.
Something like 5 manual signal boxes were eliminated.
If the Fleetwood branch comes back, there will have to be some changes at Poulton, where the former branch junction was eliminated.
Correct it was 5 signalboxes eliminated , Blackpool, Carleton, Poulton, Kirkham and Salwick ,
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,933
Location
Nottingham
It would be fair to say that one of them is used more than the other (though I can't remember which)
Trains use the southern through track to access parts of the double-length southern platform via crossovers, when there is already a train in the other part of that platform. I believe this was intended to be the only through passenger platform when the station was rebuilt in the 1970s, with the northern one intended for parcels use so retaining its much older canopy. Increasing traffic later needed that platform to be brought back into passenger use, but it remains much shorter than the other one without intermediate crossovers. So I'm expecting that the northern through track is the one that sees little use.
 

ABB125

Established Member
Joined
23 Jul 2016
Messages
3,767
Location
University of Birmingham
Trains use the southern through track to access parts of the double-length southern platform via crossovers, when there is already a train in the other part of that platform. I believe this was intended to be the only through passenger platform when the station was rebuilt in the 1970s, with the northern one intended for parcels use so retaining its much older canopy. Increasing traffic later needed that platform to be brought back into passenger use, but it remains much shorter than the other one without intermediate crossovers. So I'm expecting that the northern through track is the one that sees little use.
Might be; despite not living that far from Gloucester, I'm quite unfamiliar with its station!
Either way, one of the through tracks has concrete sleepers, welded rail etc and the other wooden sleepers and joined track (or something like that).
 