My solution to all of this:
2 new platforms next to Platform 1 for potential extra services to Selby, Garforth and Sherburn areas
2 new platforms next to Platform 2 (Short Stay due to be closed soon) for services to Haxby, Strensall and points on the York to Beverley via Pocklington route
Through road(s) and between Platforms 3 and 5 to increase the capacity on these platforms
Knock through 6 and 7 to 8, creating 2 new long platforms. An Edinburgh style scissors crossover can be put here, though it would be primarily for intercity/express trains.
9 is repurposed as the Leeds Line through line (southbound)
Through Road with crossovers to 10, situated between 9 and 10
10 and 11 used for Leeds and Wetherby terminating Southbound workings. In theory
Through Road with crossovers to 11, situated between 11 and x
New island platforms x and y. x is a Leeds Line through line (northbound) and y is a Harrogate Line loop platform, as part of a circular route using the avoiders (plus a curve bordering the ROC) in 1 direction and the main line in the other one.
I’ve been trying to work out recently if 6 tracks to the south and 4 tracks to the north are at all possible. With modifications to the Leeman Road low bridge and the Siemens Depot, I think the 4 tracks to the north would be possible. For the 6 tracks on the lines south of York, 2 might need to be in a tunnel from York Model Engineers area to Askham Bar. I believe these changes would be needed with the addition of High Speed 2 and Northern Powerhouse Rail to all of this.
I don’t see a U-Bahn style operation being possible, especially for outer suburban stuff.
2 new platforms next to Platform 1 for potential extra services to Selby, Garforth and Sherburn areas
2 new platforms next to Platform 2 (Short Stay due to be closed soon) for services to Haxby, Strensall and points on the York to Beverley via Pocklington route
Through road(s) and between Platforms 3 and 5 to increase the capacity on these platforms
Knock through 6 and 7 to 8, creating 2 new long platforms. An Edinburgh style scissors crossover can be put here, though it would be primarily for intercity/express trains.
9 is repurposed as the Leeds Line through line (southbound)
Through Road with crossovers to 10, situated between 9 and 10
10 and 11 used for Leeds and Wetherby terminating Southbound workings. In theory
Through Road with crossovers to 11, situated between 11 and x
New island platforms x and y. x is a Leeds Line through line (northbound) and y is a Harrogate Line loop platform, as part of a circular route using the avoiders (plus a curve bordering the ROC) in 1 direction and the main line in the other one.
I’ve been trying to work out recently if 6 tracks to the south and 4 tracks to the north are at all possible. With modifications to the Leeman Road low bridge and the Siemens Depot, I think the 4 tracks to the north would be possible. For the 6 tracks on the lines south of York, 2 might need to be in a tunnel from York Model Engineers area to Askham Bar. I believe these changes would be needed with the addition of High Speed 2 and Northern Powerhouse Rail to all of this.
I don’t see a U-Bahn style operation being possible, especially for outer suburban stuff.
Last edited by a moderator: