InTheEastMids
Member
- Joined
- 31 Jan 2016
- Messages
- 965
There are wooden pegs at Leicester station, took a photo of one between platforms 2 & 3 at the London Road bridge end
I happened to have about 20 minutes at Leicester today so got a coffee and went for a walk around the station.Unlike stuff like pegging out,
As far I could see, there are about 4 or 5 pegs between P2 and P3, nothing on P1/4
They've set up a similar compound at Loughborough, west of the Platform 1 access gate.
Also planned traffic management planned from July 14th-18th on the A6006 Rempstone Road adjacent to the overbridge.
NR plan to create a compound here to enable bridge replacement (as well as potentially supporting other MMLE activities), so the dates seem to indicate when construction of that compound will start.