Hi, first post on here!
I had an interview with network rail 3 weeks ago an I’ve still not heard back, the job was for track inspection technician. I thought I’d of heard back by now, I’ve been in touch with NR HR office and they didn’t really have a timescale answer.
does anyone know how long it takes?
thank you
I had an interview with network rail 3 weeks ago an I’ve still not heard back, the job was for track inspection technician. I thought I’d of heard back by now, I’ve been in touch with NR HR office and they didn’t really have a timescale answer.
does anyone know how long it takes?
thank you