£20.4m to rectify.
www.constructionnews.co.uk

Severfield reveals costly problems with HS2 bridges | Construction News
Steel giant Severfield has slipped to a £5.8m pre-tax loss in its interim results after uncovering the need to remediate 12 bridges, nine of which form

Steel giant Severfield has slipped to a £5.8m pre-tax loss in its interim results after uncovering the need to remediate 12 bridges, nine of which form part of the High Speed 2 (HS2) megaproject.
The York-headquartered firm this morning (26 November) revealed it had set aside £20.4m to resolve structures it had identified as “not in compliance with the client's weld specification requirements”.
This left Severfield with a plunge into the red in the six months to 28 September this year despite a 17 per cent hike in revenue to £252.3m.
It blamed “sub-optimal choices of welding procedures” for the bridge issues but added that these were “exacerbated by limitations in the specified weld testing regime for these projects".
A “comprehensive review” was underway involving clients, insurers and “relevant industry authorities” said the firm.
HS2 bosses confirmed that nine of the 12 sub-standard bridges formed part of the rapid rail link.