3141
Established Member
Moderator note : posts #1 - #3 originally in this thread:
Class 345 progress | RailUK Forums (railforums.co.uk)
Is that the fantastically expensive overhead with great chunky gantries that they had to put in and blow the budget because it would be so much better than any wiring they'd done previously?
Class 345 progress | RailUK Forums (railforums.co.uk)
Network Rail is upgrading the overhead electric wires near London Paddington to improve the reliability and performance of our train service.
To allow this work to take place, London Paddington station will be closed on Sunday 7 March, and trains will not run between Ealing Broadway and London Paddington.
Train services across our network will be impacted by this, and customers will not be able to travel directly into London on GWR services.
View attachment 91923
Is that the fantastically expensive overhead with great chunky gantries that they had to put in and blow the budget because it would be so much better than any wiring they'd done previously?
Last edited by a moderator: