Looking at what was then Table 19 in 1995-96 (Table 18 today), the service on the Peterboro' to Doncaster via Spalding and Lincoln seems to have changed very little in 20 years, with few, if any, enhancements that might generate extra traffic.
I realise that there were (are still, after the route upgrade?) numerous level crossings on the line, meaning the service between Spalding and Sleaford was restricted to just one shift, but wonder
a) is there demand for improved services as the line stands now? (Yes, I also realise that there is virtually no spare stock stock currently, but were some to become available?)
b) Given the population changes/increases over the years, what about opening/reopening some stations on what feels very much like a remaindered line, cut back in the 60s with very little thought given to improvements since.
For example, could new stations be considered at or around:
a) Peterborough - Spalding section
North of Werrington Jcn, to serve north Peterborough suburbs
And/or near the A15 crossing point, as a P&R for Peterborough and to serve Glinton village
Deeping St Nicholas
b) Spalding - Lincoln section
Pinchbeck (is this the largest place on the line without a station?)
Quadring
Donington
Helpringham
Burton Pedwardine
Digby
Kirkby Green
Dunston,
Nocton
Heighington/Washingborough (joint or two stations?)
c) Lincoln - Gainsborough Lea Rd - Doncaster section
Beckingham
Finningly/Blaxton
SE Doncaster (somewhere near where the M18 crosses the line)
Of course, even if the platforms to some of these stations still exist, the costs of re-openings are awful today but could some of these be justified?
(Mods, if you want to put this into infrastructure, please do so).
I realise that there were (are still, after the route upgrade?) numerous level crossings on the line, meaning the service between Spalding and Sleaford was restricted to just one shift, but wonder
a) is there demand for improved services as the line stands now? (Yes, I also realise that there is virtually no spare stock stock currently, but were some to become available?)
b) Given the population changes/increases over the years, what about opening/reopening some stations on what feels very much like a remaindered line, cut back in the 60s with very little thought given to improvements since.
For example, could new stations be considered at or around:
a) Peterborough - Spalding section
North of Werrington Jcn, to serve north Peterborough suburbs
And/or near the A15 crossing point, as a P&R for Peterborough and to serve Glinton village
Deeping St Nicholas
b) Spalding - Lincoln section
Pinchbeck (is this the largest place on the line without a station?)
Quadring
Donington
Helpringham
Burton Pedwardine
Digby
Kirkby Green
Dunston,
Nocton
Heighington/Washingborough (joint or two stations?)
c) Lincoln - Gainsborough Lea Rd - Doncaster section
Beckingham
Finningly/Blaxton
SE Doncaster (somewhere near where the M18 crosses the line)
Of course, even if the platforms to some of these stations still exist, the costs of re-openings are awful today but could some of these be justified?
(Mods, if you want to put this into infrastructure, please do so).