Jack hammer in use Werrington Junction Upgrade 19th June 2020
After vibrating steel piles into the ground a few days ago under the Cock Lane footbridge where there is limited headroom, shorter lengths have now been welded to them and the hammer is being used to sink the piles further.
Wednesday 5th August 2020: photo's from around the A15 bridge and the temporary bridge near Werrington. Newly opened footpath/bridleway/cycle path:
Wednesday 5th August 2020: photo's from around the A15 bridge and the temporary bridge near Werrington. Newly dug and filled surface for arrival of a crane to lift bridge sections into place: