Purpose of engineering work between Leamington Spa/Bicester North/Oxford this week

Status
Not open for further replies.

BanburyBlue

Member
Joined
18 May 2015
Messages
732
Hi all

Just being curious, anyone know what the engineering work that has shut the line between Leamington and Oxford/Bicester this week? I'm assuming it must be Aynho Junction or north, but seems a long stretch to shut, unless it was Banbury station itself? If it was either south of Banbury, or North of Banbury, why run rail replacement buses from Oxford to Leamington, and Bicester to Leamington.

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
16,123
Hi all

Just being curious, anyone know what the engineering work that has shut the line between Leamington and Oxford/Bicester this week? I'm assuming it must be Aynho Junction or north, but seems a long stretch to shut, unless it was Banbury station itself? If it was either south of Banbury, or North of Banbury, why run rail replacement buses from Oxford to Leamington, and Bicester to Leamington.

Thanks
Botley Road, two or three big track renwal jobs north of Banbury. Two bridge renewals at Kings Sutton fell out the original plan. Plus HS2 and renewal of the River Avon viaduct between Leamington and Coventry. If you take out anywhere along that route that needs a big chunk of time you might as well take a decent distance as freight have to divert regardless and would rather it done in one go.
 

BanburyBlue

Member
Joined
18 May 2015
Messages
732
Botley Road, two or three big track renwal jobs north of Banbury. Two bridge renewals at Kings Sutton fell out the original plan. Plus HS2 and renewal of the River Avon viaduct between Leamington and Coventry. If you take out anywhere along that route that needs a big chunk of time you might as well take a decent distance as freight have to divert regardless and would rather it done in one go.
Thanks - bang it all into one engineering blockage - makes sense.
 

rower40

Member
Joined
1 Jan 2008
Messages
337
Also changes to the crossovers at Oxford North Junction, with new routes and associated interlocking data.
 

sammyg901

Member
Joined
24 Mar 2009
Messages
326
Bit of trouble this morning - the 0720 ex Oxford Parkway was only 4 coaches. This service was picking up from the RRBs at Bicester and then scheduled to be a slow service into London which does seem to be very poor planning. It was leaving people behind by the time it reached Haddenham and Thame Parkway and had to run fast from High Wycombe.

Seems like tomorrow another unit comes off of Aylesbury ECS to Bicester Village and then in service to OXP so hopefully that'll be joining to the unit that is there overnight and tomorrow it'll be a longer train

Also as it stands today the last two trains north the 0005 and 0010 to Aylesbury are cancelled so not sure how they'll handle that, delay the 2316 and hold the RRBs at Princes Risborough perhaps
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,314
River Avon viaduct works (strengthening, waterproofing, repairs) documented here


 

fishwomp

Member
Joined
5 Jan 2020
Messages
560
Location
milton keynes
River Avon viaduct works (strengthening, waterproofing, repairs) documented here



110 units installed & waterproofed
Over 2000t material removed
Over 2300t of new material back in
New track back in on a new alignment with a 330mm + lift and a 200mm+ slew

Those links are v informative: substantial bit of viaduct fixing there. Interesting: I hope the 200mm slew was in the direction of making room for a second track here. Anyone aware of if that's the case, hard to tell from the photos?

Network Rail's description here: https://www.networkrailmediacentre....sed-of-major-work-between-coventry-and-oxford - lists HS2 bridge nr Kenilworth, Oxford signalling, and 2 miles of track renewal around Banbury.
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,314
Interesting: I hope the 200mm slew was in the direction of making room for a second track here.
Correct, passive provision for twin tracks across the viaduct. In fact the slue was max. 450mm towards the west viaduct wall.
 