Narrowgauge725
Member
Just had a long wait at Scremerston level crossing. North bound train crawled through south bound at line speed.
LNER site reports signalling problem south of Berwick Upon Tweed. What signalling problem would still allow trains to continue at a slow speed? Gates on crossing went up and down as normal.
LNER site reports signalling problem south of Berwick Upon Tweed. What signalling problem would still allow trains to continue at a slow speed? Gates on crossing went up and down as normal.