onionjoe76
Member
- Joined
- 15 Feb 2011
- Messages
- 58
Does the single bi-directional line that runs from just outside Coatbridge Sunnyside then down behind Coatbridge Central and joins the mainline at Whifflet South junc ever get used?
I remember many years ago (mid 90's) during flooding in GLagow Central Low Level trains went to and from Lanark via this line in to Queen Street Low Level, but other than this I've never seen or heard of anything else running on it?
Anyone know differently? And if so, what times do the trains run on it, would love to see one on it again.
I remember many years ago (mid 90's) during flooding in GLagow Central Low Level trains went to and from Lanark via this line in to Queen Street Low Level, but other than this I've never seen or heard of anything else running on it?
Anyone know differently? And if so, what times do the trains run on it, would love to see one on it again.