roversfan2001
Established Member
Due to some works on the North TPE route the Manchester Airport (MIA)-Newcastle (NCL) services are running via Doncaster (DON) in the path of the Manchester-Cleethorpes (CLE) with a separate Doncaster-Cleethorpes service running instead. Thoughout the day there is a 4 minute connection eastbound between them. The minimum connection time at Doncaster is 7 minutes - why on earth haven't they just scheduled the DON-CLE services to depart 7 minutes after the MIA-NCL services arrive!? Seems a stupid decision.