Personally I've never really understood why at least one of the northern trans-Pennine rail routes wasn't electrified years ago. And as for 'discontinuous' electrification of a route with a very high frequency train service - I despair, it makes me feel embarrassed as an engineer that it's even being considered. It's not 'smart' it's just weasel-word penny-pinching.
It was called the Woodhead route between Manchester and Sheffield completed as long ago as 1954 with a brand new tunnel and electrification through the Pennines. Had it remained open for passenger traffic, the line could easily have been upgraded to 100mph for most of its length. A new chord should have been built between Victoria and Midland stations instead of turning back at Victoria. Had that happened in 1954 together with 25kvac electrification adopted as standard only two years later, I think Woodhead would still be open.