Tyne and Wear Metro Bidders:

Status
Not open for further replies.

TrainBrain185

Member
Joined
2 Jun 2009
Messages
310
Location
County Durham
Hello, I am a new member of this interesting Forum ;).

Our local urban rail system, the Tyne and Wear Metro has opted to operate on a Franchise basis. Apart from Metro Managements' own bid, the other bidders confirmed are Serco NedRail, DB Rail and China's MTR Corperation.

Are there any views and comments from you guys who may have had personal experience of those above names.

Best regards:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
20,402
Location
0035
I'm not aware of the exact details, but do you know is this a franchise set by the DfT in the same way as the national network, with revenue risk, or a contract set by TWITA with more laid down, such as Merseyrail/LOROL?
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
I'm not aware of the exact details, but do you know is this a franchise set by the DfT in the same way as the national network, with revenue risk, or a contract set by TWITA with more laid down, such as Merseyrail/LOROL?

The franchises appear to be negotiated between Nexus and the bidders - Nexus is a wholly publicly funded Tyne & Wear Passenger Tspt Exec. :

"Nexus, the Tyne and Wear Passenger Transport Executive, is to retain control of the infrastructure side of the business and let contracts within an ambitious £350 million modernisation programme.

This includes new communications systems, a comprehensive modernisation plan for 45 stations and wide-ranging overhaul of overhead lines, track and structures on the 56km network.

Nexus will let the operations franchise to run about 450 individual train services per day, including within it fleet maintenance and responsibility for a complete refurbishment of all 90 Metrocars.

The value of the concession over nine years has been estimated externally at between £200-£300 million.

The concession will begin operation in April 2010, after Nexus secured a funding commitment from Government covering both the capital and revenue sides of its business plan.
"

Bid document : http://www.nexus.org.uk/wps/wcm/resources/file/eb1cbc0c5a23b67/PINNotice.pdf
 

TrainBrain185

Member
Joined
2 Jun 2009
Messages
310
Location
County Durham
Interesting comments. I have been visiting Tyne and Wear a few times lately and personally wonder what the potential outside bidders are taking on with regard the fleet condition with a refurbishment mandate included. Seeing a good few passing in the stations, their bodywork condition on some are short of atrocious, the rattling interiors are shabby in the awful grey scheme and the ones I rode on having to endure multiple flats and vibrations. They have certainly gone downhill since riding them a good number of years ago.
Its perhaps then a good time to see fresh blood run the system as on these recent occasional visits, the once showpiece system of the UK looks a run down system.
 

spoony

Member
Joined
18 Sep 2008
Messages
479
Location
Roker Park, Sunderland. Next to the Stadium of Lig
Interesting comments. I have been visiting Tyne and Wear a few times lately and personally wonder what the potential outside bidders are taking on with regard the fleet condition with a refurbishment mandate included. Seeing a good few passing in the stations, their bodywork condition on some are short of atrocious, the rattling interiors are shabby in the awful grey scheme and the ones I rode on having to endure multiple flats and vibrations. They have certainly gone downhill since riding them a good number of years ago.
Its perhaps then a good time to see fresh blood run the system as on these recent occasional visits, the once showpiece system of the UK looks a run down system.

Tell me about it, I ride the bloody things each day to work. Absolutely disgusting livery.
--- old post above --- --- new post below ---
or replace the trains, which are getting on for 30 years old

4001 which was the original test protoype is still out. Indeed I was on it yesterday:|
 