gingerheid
Established Member
- Joined
- 2 Apr 2006
- Messages
- 1,571
Just seen this article:
https://www.examinerlive.co.uk/news...dreadful-yorkshire-train-service-uks-17884447
How correct is this? I feel like the Harwich - Cambridge boat train didn't run at all for well over a month?
https://www.examinerlive.co.uk/news...dreadful-yorkshire-train-service-uks-17884447
A morning commuter train from Harrogate to Leeds was the most cancelled rail service in Britain.
The 7.13am Northern service failed to run 28 times since the failing operator introduced new timetables on December 15, The Sunday Times reports.
That means the service was cancelled on more than half the 55 mornings it was scheduled to run.
How correct is this? I feel like the Harwich - Cambridge boat train didn't run at all for well over a month?